13
Preparing for Installation
Point to Point Bridge Configuration
3.
Once both units are powered on and physically connected, LED 5 and 6 (labeled
P0
and
P1
) on both units begin alternately blinking, indicating that the role is unknown
and provisioning is in process. This process takes about 10 to 20 seconds.
4.
Simultaneous rapid blinking of these two LEDs indicates that provisioning is complete.
5.
After provisioning is complete, LED 4 (
ROLE
) indicates which unit is the Root and Non-
Root unit. The
ROLE
LED is solid yellow for the Root Bridge while the Non-Root
Bridge’s
ROLE
LED is OFF.
6.
Take note of which unit is the Root Bridge and which is the Non-Root Bridge.
7.
When the auto provisioning process is complete, you must reboot both units. A reboot
is triggered by disconnecting the Ethernet cable.
8.
During the reboot only the bottom LED,
PWR
is lit. Once the reboot completes you
will see activity on the
WLAN
LED, indicating wireless communication between the
pair.
You have completed auto provisioning the Root and Non-Root Bridge pair.
Figure 6.
Auto Provisioning a Root Bridge and a Non-Root Bridge
Step 3: Prepare the Administrative Computer
NOTE:
The following procedure is applicable if the administrative computer is running
Windows XP or Windows 2000. If you are using a different operating system, refer to the
documentation that was shipped with your operating system for information on how to
modify the computer’s IP address settings.
PoE
Injector
PoE
Injector
Connect Directly via
Ethernet Cable to Auto
Provision
To AC Power
Source
To AC Power
Source
Содержание ZoneFlex 7731
Страница 2: ......
Страница 59: ...55 Verifying the Connection Channel Optimization Figure 48 SpeedFlex Performance Test succeeded ...
Страница 61: ...57 ...
Страница 62: ...58 ...
Страница 63: ...59 ...
Страница 64: ...Copyright 2006 2013 Ruckus Wireless Inc 350 West Java Dr Sunnyvale CA 94089 USA www ruckuswireless com ...