28
M0106-1 ver 2.3
4.1.5 Activities and intervals on tool attachment
Equipment
Maintenance
activity
Interval
Description
Tool attachment
Inspection
2 weeks
Visual inspection of tool attachment (see section
4.2.2).
Grooves
Cleaning
1 months
Wipe the grooves for the locking balls clean (see
section 4.3.2).
Signal
connector
Cleaning
1 months
Wipe the contact surface clean (see section
4.3.2).
Tool attachment
Cleaning
1 months
Cleaning of tool attachment, interval depending
on the environment (see section 4.3.2).
4.2 Visual inspection
4.2.1 Inspection of the tool changer
Visually check the following:
Check
Note
Air sealings
Not worn, damaged or dirty
Locking balls
Greased. Not dirty
Signal pins (TC20-8E only)
Not damaged or dirty
Cables
Not squeezed or damaged
All parts
No wear
All parts
No damage
All parts
No dirt
4.2.2 Inspection of the tool attachment
Visually check the following:
Check
Note
Air sealing contact surface
Not damaged or dirty
Signal contact surface (TA20-8E only)
Not worn or dirty
Cables
Not squeezed or damaged
All parts
No wear
All parts
No damage
All parts
No dirt
Содержание P0101
Страница 2: ...2 M0106 1 ver 2 3 ...
Страница 18: ...18 M0106 1 ver 2 3 2 1 8 Pneumatic diagram for TC20 and TA20 ...
Страница 19: ...M0106 1 ver 2 3 19 2 1 9 Circuit diagram E0185 001 for P0103 and P0104 P0124 ...
Страница 37: ...M0106 1 ver 2 3 37 ...
Страница 38: ...38 M0106 1 ver 2 3 ...