M0106-1 ver 2.3
27
4.1.2 Recommended tools for maintenance
Tools
Applications
Complete set of Allen keys
For dismounting and mounting.
Pair of pliers
For dismounting the signal pins.
Screw driver
For removing the air sealings.
Torque wrench
For all socket head cap screws
4.1.3 Wear parts
Wear parts should be replaced before considerable damage occurs. The interval depends on the
number of tool changes and its working environment. Generally, the more contaminated
environment, the closer maintenance intervals.
The following parts are considered as wear parts:
o
Air sealings
o
Signal pins
o
Connector
4.1.4 Activities and intervals on tool changer
Equipment
Maintenance
activity
Interval
Description
Tool changer
Inspection
2 weeks
Visual inspection of tool changer (see section
4.2.1).
Tool changer
Cleaning
1 month
Cleaning of tool changer, interval depending on
the environment (see section 4.3.1).
Looking balls
Clean and
lubricate
1 month
Check, wipe clean and lubricate looking balls
(see section 4.3.1).
Signal pins
Cleaning
1 month
Wipe the pins clean (see section 4.3.1).
Air sealings
Replace
18
months
Wear parts, interval is depending on number of
tool changes and the environment (see section
4.4.1).
Signal pins
Replace
18
months
Wear parts, interval is depending on number of
tool changes and the environment (see section
4.4.2).
Tool changer
Service
5 years
Complete service, to be done by Robot System
Products (see section 4.5).
Содержание P0101
Страница 2: ...2 M0106 1 ver 2 3 ...
Страница 18: ...18 M0106 1 ver 2 3 2 1 8 Pneumatic diagram for TC20 and TA20 ...
Страница 19: ...M0106 1 ver 2 3 19 2 1 9 Circuit diagram E0185 001 for P0103 and P0104 P0124 ...
Страница 37: ...M0106 1 ver 2 3 37 ...
Страница 38: ...38 M0106 1 ver 2 3 ...