damp, particularly during the construction phase, can lead to window
elements warping.
u
Avoid preventing the circulation of air (e.g. due to deep reveals, curtains
and unfavourable positioning of heaters or the like).
u
Intensively air out the room several times per day.
Open all windows and balcony doors for approximately 15 minutes so
that the air in the room can be completely replaced.
u
Provide adequate ventilation during holiday periods as well.
u
Create a ventilation plan for construction projects if necessary.
2.6 Operation
The safety symbols and markings and the associated warning instructions
explained below apply to the safe operation of windows and balcony doors.
Safety symbols and markings
Symbol
Meaning
Top-Hung
Side-Hung
Falls from open windows and
balcony doors present an immediate
risk of death and pose the risk of
serious injuries.
Take care when in the vicinity of open
windows and balcony doors.
Keep children and anyone unable to
understand the risks away from the
hazardous area.
Trapping body parts in the opening
between sash and frame may lead to
serious injuries.
When closing windows and balcony
doors, never grip between the sash and
frame and always exercise caution.
Keep children and anyone unable to
understand the risks away from the
hazardous area.
Placing additional loads on the sash
may lead to minor injuries and
property damage.
Avoid placing additional loads on the
sash.
The impact of wind may lead to
minor injuries and property damage.
Avoid exposing the open sash to wind.
Close and lock the window and balcony
door sash in windy or draughty condi-
tions.
Security
Operation
Subject to change.
Roto FS Kempton
IMO_539_EN_v0
·
11 / 2020
· 19