Installation
UPT-606
Page 11
lers are installed on one top hat rail, the minimum
clearance specified in section 5 "Technical data" on
page 8 must be allowed between them.
4. Wire the system in accordance with the instructions
in section 7.3 "Power supply" on page 12,
section 7.6 "Wiring diagram (standard)" on page 14
and the ROPEX Application Report. The information
provided in section 7.1 "Installation steps" on
page 10 must also be heeded additionally.
5. Connect the CIRUS temperature controller to the
PROFIBUS master using a cable according to
IEC 61158.
Check the tightness of all the system connec-
tions, including the terminals for the impulse
transformer windings.
6. Make sure that the wiring conforms to the relevant
national and international installation regulations.
!