DIB-500 R4.1
Product description
Wiring diagrams of the DIB-500 R4.1
48
Installation and Operation Manual 90DIB500IM02 – 5.2
3.4.1.4
Hybrid variant – eight carriers (variant with LAN routing unit, LRU [redundancy
package])
Two equipment racks installed next to each other are used for the hybrid variant as of
five carriers. Apart from the wiring between the equipment racks A and B, the wiring cor-
responds to that of the hybrid variant with four carriers, refer to section 3.4.1.2.
Table 3.19 Legend: Wiring diagram DIB-500 R4.1 – hybrid variant with eight carriers (diversity)
No.
Connection from
to network or hardware component
1
Connection panel A (B1)
Connection panel B (A1) for connecting a second
equipment rack
2
Connection panel A (PPS)
Connection panel B (PPS) for transmitting the PPS
synchronization clock from TIB A
3
TIB B (LAN 3)
TIB C (LAN 3) for connecting the TIB
4
ACS A (RxD Ext)
ACS B (Rx Ext) for connecting the reception paths
for diversity reception
5
ACS A (Rx Ext)
ACS B (RxD Ext) for connecting the reception paths
for diversity reception