background image

DIB-500 R4.1

Product description

Scope of delivery of the DIB-500 R4.1

58

Installation and Operation Manual 90DIB500IM02 – 5.2

Содержание DIB-500 R4.1

Страница 1: ...90DIB500IM02 5 2 Secure Communications Installation and Operation Manual DIB 500 R4 1 Digital Indoor Base Station Installation and Operation Manual...

Страница 2: ...Manual 90DIB500IM02 5 2 2010 Rohde Schwarz Professional Mobile Radio GmbH 31848 Bad M nder Germany Printed in Germany Subject to change Data without tolerance limits is not binding Encryption componen...

Страница 3: ...2 1 5 2 Special notations 12 1 5 2 1 Designation of components installed 12 1 5 2 2 Sequence of actions 12 1 5 2 3 Safety instructions used 13 1 5 2 4 General instructions used 14 1 6 History of chang...

Страница 4: ...2 1 3 Synthesizer 30 3 2 1 4 Power supply 30 3 2 1 5 Receiver transmitter carrier 30 3 2 2 Antenna Coupling System ACS 30 3 2 3 Voltage supply and alarming system 33 3 2 3 1 Mounting frame optional fo...

Страница 5: ...vity variant 51 3 4 2 1 Cavity variant four carriers 52 3 4 2 2 Cavity variant eight carriers 54 3 4 3 Internal wiring of the high power variant one carrier 55 3 5 Voltage supply of the DIB 500 R4 1 5...

Страница 6: ...cting the equipment racks A and B 74 4 4 3 1 Procedure for connecting equipment racks A and B 75 5 Commissioning 77 5 1 Connection to the electrical system 79 5 1 1 Tools and aids 79 5 1 2 Connection...

Страница 7: ...he service computer serially 106 Connecting the service computer Ethernet 106 5 7 3 Deleting the ARP buffer 106 5 7 4 Configuring and generating network configurations via the NMC 515 ConfigurationMan...

Страница 8: ...supply 126 5 9 3 Checking voice channels 127 5 9 3 1 Checking the voice channel two carriers 127 5 9 3 2 Checking the voice channel more than two carriers 129 5 9 4 Checking the installation site of t...

Страница 9: ...indicate the order in which the tasks are to be performed When you have completed a work step always navigate to the next work step via the overview table to ensure that the tasks are performed in the...

Страница 10: ...ns described in the following serve for the enhanced comprehensibil ity of information They emphasize specific pieces of information help you to recognize this information fast and take corresponding...

Страница 11: ...measures to be taken to avert the specified hazard Shown below are four safety advice symbols which indicate the severity of the danger by means of different keywords danger warning caution attention...

Страница 12: ...es in this document Here it will be distin guished between the following reasons for changes Content related changes e g functional expansions or new features Formal changes e g changes to the layout...

Страница 13: ...e product User ManualNMC 511 FaultManager contains information required for the proper operation of the product User Manual NMC 515 ConfigurationManager contains information required for the proper op...

Страница 14: ...ile Radio GmbH offers support contracts upon request For information on this topic please also revert to our responsible service partner or directly to Rohde Schwarz Professional Mobile Radio GmbH Pro...

Страница 15: ...ts may be viewed upon request The directive on radio equipment and telecommunications terminal equipment Gesetz ber Funkanlagen und Telekommunikationsendeinrichtungen FTEG implemented by the European...

Страница 16: ...e into consideration the applicable national and international provisions are performed exclusively by trained specialists who have been authorized accordingly damage to the product and product defect...

Страница 17: ...the structural design of the product is modified without the consent of the Rohde Schwarz Professional Mobile Radio GmbH replacement parts are used that differ from the components installed by defaul...

Страница 18: ...omponents The replacement of components inside the component cabinet other than network or hardware noted here must be performed exclusively by service personnel of Rohde Schwarz Professional Mobile R...

Страница 19: ...of the product 2 3 4 Hazardous substances The product does not contain any substances specified in the Ordinance on Hazardous Substances published in BGBL I p 1782 Gefahrstoffverordnung Ordinance on...

Страница 20: ...ters Rohde Schwarz Professional Mobile Radio GmbH has developed a disposal concept and fully assumes the duty of taking back and disposing of electric and electronic wastes accord ing to the ElektroG...

Страница 21: ...In the scenario described two Tx Rx antennas will be used For diversity reception the reception paths between the two equipment racks will be connected Via the follwing interfaces the base station ca...

Страница 22: ...allation and Operation Manual 90DIB500IM02 5 2 Figure 3 1 shows the front view of the DIB 500 R4 1 with four carriers The correspond ing table describes the components in greater detail Figure 3 1 Fro...

Страница 23: ...em Mounting frame optional for VDC voltage supply System controller optional for VDC volt age supply Alarm input output module optional with VDC voltage supply VAC voltage supply unit optional includ...

Страница 24: ...its fails a local exchange function integrated in the TIB will assume responsibility for the exchange functionality within the TIB in fall back mode The TIB network component is equipped with hardware...

Страница 25: ...ACS includ ing voltage supply 3 Tx Carrier B Tx transmitter output carrier B 4 RxD Carrier B Rx receiver input carrier B Diversity 5 Rx Carrier B Rx receiver input carrier B 6 Rx Carrier A Rx receive...

Страница 26: ...ons 13 LAN 2 Ethernet interface to the internal switch for connecting the service computer locally 14 LAN 1 Ethernet interface to the internal switch to the system controller depending on the variant...

Страница 27: ...PUC forwards the signalling from the transceivers to the TOS or the signalling from the TOS via the air interface back to the transceivers GPS module The GPS module is a hardware subcomponent within t...

Страница 28: ...essor Unit MSU 3 2 1 4 Power supply The power supply is a hardware component and provides the voltage supply for the TIB 3 2 1 5 Receiver transmitter carrier A carrier is a hardware component consisti...

Страница 29: ...ticouplers2 2 x duplex filters 2 x VSWR measuring points Isolator s 4 1 Tx Rx antenna antenna A 1 Rx antenna antenna B 3 2 Tx Rx antennas antenna A Cavity like the hybrid variants but no single carrie...

Страница 30: ...iversity 2 Antenna A Antenna A Tx Rx antenna connection 3 RxD TIB A2 Antenna B Rx output carrier TIB A2 only in the case of diversity 4 Rx TIB A1 Antenna A Rx output carrier TIB A1 5 Rx TIB A2 Antenna...

Страница 31: ...voltage supply The mounting frame is not installed in the standard version of the DIB 500 R4 1 with VDC voltage supply The mounting frame is required if the optional system controller and alarm input...

Страница 32: ...in detail Figure 3 7 Front view of system controller Table 3 6 Legend components of the voltage supply unit No Constituent 1 Mounting frame 2 Subrack for the AC voltage supply module s the number of...

Страница 33: ...rms in the system controller display window Figure 3 9 shows the rear view of the system controller The following table describes these in detail Figure 3 9 Rear view of system controller Table 3 8 Le...

Страница 34: ...The hardware component is installed in a mounting frame that is supplied with voltage via the connection panel Figure 3 10 shows the alarm input output module The following table describes these indic...

Страница 35: ...hich in turn supplies the system controller with voltage The AC voltage supply module is a hardware subcomponent of the voltage supply unit The installed network hardware components are supplied with...

Страница 36: ...Unit LRU redundancy package A DIB 500 R4 1 as of five carriers can optionally be operated with redundant connecting lines of the TIB In this case the connection panel and the LRU including the top ha...

Страница 37: ...e of TIB A B or C D for the third fourth TIB mod ule 4 External alarm inputs LSA 5 External E1 connections to TIB B RJ 45 6 External E1 port with connection to E1 relay RJ 45 7 External E1 connections...

Страница 38: ...egrated LRU LAN Routing Unit LRU For the variants of the DIB 500 R4 1 with more than four carriers the LRU hardware component ensures the communication between the TIB modules integrated in the two eq...

Страница 39: ...up to two fan subracks made up of a fan and a fan filter mat are thus integrated in each equipment cabinet The fan unit serves for optimum verti cal venting of the components installed inside the equi...

Страница 40: ...is completely wired and prepared for commissioning Inside the equipment rack all the connecting cables are marked with the corresponding part no and port designation e g for Port 1 P1 of the correspon...

Страница 41: ...more than four carriers the equipment cabinets are positioned next to each other on site and connected with each other refer to Figure 3 17 Figure 3 17 DIB 500 R4 1 Hybrid variant with two carriers Wi...

Страница 42: ...ual 90DIB500IM02 5 2 3 4 1 1 Internal wiring of the hybrid variant two carriers Figure 3 18 shows the internal wiring of the DIB 500 R4 1 with two carriers Upon deliv ery the connections have already...

Страница 43: ...f the DIB 500 R4 1 3 4 1 2 Internal wiring of the hybrid variant four carriers Figure 3 19 shows the internal wiring of the DIB 500 R4 1 with four carriers Upon deliv ery the connections have already...

Страница 44: ...IB500IM02 5 2 3 4 1 3 Hybrid variant eight carriers Two equipment racks installed next to each other are used for the hybrid variant as of five carriers Apart from the wiring between the equipment rac...

Страница 45: ...4 1 Figure 3 20 shows the connection between the equipment racks of the DIB 500 R4 1 in the hybrid variant with eight carriers The connections are described in detail in the associated table Figure 3...

Страница 46: ...rid variant with four carriers refer to section 3 4 1 2 Table 3 19 Legend Wiring diagram DIB 500 R4 1 hybrid variant with eight carriers diversity No Connection from to network or hardware component 1...

Страница 47: ...1 Figure 3 21 shows the connection between the equipment racks of the DIB 500 R4 1 in the hybrid variant with eight carriers The connections are described in detail in the associated table Figure 3 21...

Страница 48: ...ection panel A PPS Connection panel B PPS for transmitting the PPS synchronization clock from TIB A 3 TIB A LAN 3 LRU P1 for connecting the TIB D ring connection installed in a second equipment racks...

Страница 49: ...IB 500 R4 1 in the cavity variant The cavity couplers one per carrier are installed in the respective equipment cabinet s of the DIB 500 R4 1 With more than four carriers the equipment cabinets are po...

Страница 50: ...anual 90DIB500IM02 5 2 3 4 2 1 Cavity variant four carriers For the DIB 500 R4 1 in the cavity variant the cavity couplers are installed in the equip ment carrier s refer to Figure 3 22 Upon delivery...

Страница 51: ...f the DIB 500 R4 1 Figure 3 23 shows the wiring between the equipment racks of the DIB 500 R4 1 in the cavity variant with four carriers The connections are described in detail in the associ ated tabl...

Страница 52: ...dentical to hybrid variant eight carri ers The connection between the equipment cabinets A and B is identical for the hybrid vari ant and cavity variant with eight carriers The connection between the...

Страница 53: ...f the DIB 500 R4 1 3 4 3 Internal wiring of the high power variant one carrier Figure 3 24 shows the internal wiring of the DIB 500 R4 1 with one carrier Upon deliv ery the connections have already be...

Страница 54: ...vered in two 19 equipment racks The height of the equipment rack s will increase by 12 rack units each for the cavity variants The variants of the DIB 500 R4 1 depend on the following characteristics...

Страница 55: ...package for variants with five or more carriers Standard consisting of connect ing cables3 or Redundancy package optional consisting of the LRU network component including the top hat rail power supp...

Страница 56: ...DIB 500 R4 1 Product description Scope of delivery of the DIB 500 R4 1 58 Installation and Operation Manual 90DIB500IM02 5 2...

Страница 57: ...asks Work steps Described in Installing equipment racks Section 4 3 on page 61 Connecting equipment racks as of 5 carriers Removing the top cover of the equipment rack Section 4 4 1 on page 63 Mountin...

Страница 58: ...ities These will be shown in the following sections 4 1 1 Hybrid variant Figure 4 1 visualizes the standard setup options of the hybrid variant with four and eight carriers in one operation room each...

Страница 59: ...cavity variant with four and eight carriers in one operation room each Figure 4 2 Standard upright variant DIB 500 R4 1 with four and eight carriers Required cable lengths The cable sets for the Ethe...

Страница 60: ...trip hazards for the operator or any other persons the required minimum distances and cable lengths are complied with Further Applicable Document For information on the site requirements please refer...

Страница 61: ...f tilt during transport may cause damage to the product Secure the equipment rack with tightening straps on the sides before transporting the equipment rack e g with a lift truck 1 Place the equipment...

Страница 62: ...rack the top cover of the equipment rack has to be removed The following tools and aids are required for removing and installing the top cover Phillips head screwdriver size PH2 Coin to unscrew tight...

Страница 63: ...fer to Figure 4 5 Figure 4 5 Equipment rack top cover fastening screws The grounding connection may be damaged if you remove the equipment cabi net top cover without removing the grounding cable conne...

Страница 64: ...you can select any equipment rack for installing the LRU Your selection will define this equipment rack as rack B We recommend mark ing the equipment racks accordingly If you are using an odd number o...

Страница 65: ...t rail from shifting top hat rail end brackets must be installed Before the components are mounted on the top hat rail a top hat rail end bracket must be installed on the left hand end of the top hat...

Страница 66: ...tage source on site is switched off 1 Clamp the top hat rail end holder onto the top hat rail in the appropriate position refer to Figure 4 7 2 Tighten the screws using a flat bladed screwdriver You h...

Страница 67: ...tion panel The procedure for connecting the voltage supply cable for the top hat rail power supply unit is described in the following Proceed as follows to connect the voltage supply cable of the top...

Страница 68: ...s Always wear protective gloves when handling the component Electric shock when touching live parts Hardware components in the equipment cabinet are live When performing work in the equipment cabinet...

Страница 69: ...ecting voltage supply cables to the top hat rail power supply unit is described in the following Proceed as follows to connect the voltage supply cable to the top hat rail power supply unit Preparatio...

Страница 70: ...ear protective gloves when handling the component Electric shock when touching live parts Hardware components in the equipment cabinet are live When performing work in the equipment cabinet ensure tha...

Страница 71: ...top hat rail Figure 4 12 LRU on the top hat rail The procedure for inserting the LRU is described below Inserting the LRU Preparation The network element must have been put out of operation temporaril...

Страница 72: ...ltage supply cable to the LRU according to the labelling refer to Fig ure 4 13 Figure 4 13 Interfaces of the LRU 2 Clamp the LRU onto the top hat rail from above The catch must snap in audibly The ins...

Страница 73: ...may be torn out of the terminals Proceed with caution when installing the top hat rail power supply unit Ensure that the voltage supply cables do not get caught on any projecting parts dur ing install...

Страница 74: ...power supply unit must have been installed The procedure for installing top hat rail end brackets is described in section 4 4 2 3 on page 66 4 4 3 Connecting the equipment racks A and B To be able to...

Страница 75: ...rom the first to the second and from the second to the third TIB module etc TIB modules racks A and B via Ethernet with redundancy optional The TIB modules are connected in the form of a ring via Ethe...

Страница 76: ...DIB 500 R4 1 Installation Connecting equipment racks as of 5 carriers 78 Installation and Operation Manual 90DIB500IM02 5 2...

Страница 77: ...the electrical system Connection with the grounding system Section 5 1 2 on page 79 Connecting the voltage supply Section 5 1 3 on page 81 Connecting the VDC voltage supply Section 5 1 3 1 on page 82...

Страница 78: ...tput power Section 5 8 2 on page 116 Measuring and checking the carriers impedance adjustment Section 5 8 3 on page 119 Function tests DIB 500 R4 1 Checking operating statuses Section 5 9 2 on page 12...

Страница 79: ...tionally B GPS antenna incl accessories from the scope of delivery Coin to unscrew tighten the mounting screws of the equipment rack top cover Cable end sleeve calliper Cable end sleeves Connecting ca...

Страница 80: ...accessible from above The top cover of the equipment rack must have been removed Carry out the following steps 1 Loosen the outer nut of the grounding connector on the equipment cabinet using an M13...

Страница 81: ...anel for this purpose each with grounding and refer to Figure 5 2 Figure 5 2 Voltage supply connectors The procedures for connecting the VDC and VAC voltage supply are described in the fol lowing sect...

Страница 82: ...the equipment rack Preparation The site must be prepared in compliance with the document Site Requirements The equipment rack must be connected to the grounding system A voltage source in the form of...

Страница 83: ...negative voltage supply cable with the terminal 3 identified by refer to Figure 5 3 Ex works there is no connection from the primary supply connections to the housing of the equipment rack Thus all th...

Страница 84: ...y cable s is are already connected to the mounting frame and can be connected to the voltage source on site With a VAC voltage supply optional the DIB 500 R4 1 can be connected to the voltage source o...

Страница 85: ...the document Site Requirements The equipment rack must be connected to the grounding system A voltage source in the form of a voltage supply connector or an uninterruptible power supply UPS is availab...

Страница 86: ...e commissioning of the network requires additional work steps that need to be performed in the equipment cabinet the voltage source must stay switched off for the time being Switching on the voltage s...

Страница 87: ...5 plug connector The following table s describe s the pin assignments in the standard configuration of the respective connect ing lines that are connected using RJ 45 plug connectors Figure 5 7 Pin as...

Страница 88: ...must comply with the site requirements Carry out the following steps If cables are routed over sharp edges or in bending radiuses too small for the cables the cables may be damaged If cables are rout...

Страница 89: ...onnections 5 1 4 2 Connecting E1 LSA The procedure for connecting E1 connectors LSA is described below Proceed as follows to connect E1 connectors LSA Preparation The connecting cables provided must c...

Страница 90: ...ion of the GP antenna supplied roof wall mast installation Responsibility for the installation commissioning and maintenance of the GPS antenna The operating company is responsible for the proper inst...

Страница 91: ...are installing the antenna on a mast fasten the fibre ribbon on the antenna mast as an additional means of securing the GPS antenna against slipping The GPS antenna must not be installed on the anten...

Страница 92: ...bles are routed over sharp edges or in bending radiuses too small for the cables the cables may be damaged If cables are routed over sharp edges or in bending radiuses too small for the cables the cab...

Страница 93: ...GPS and TETRA Each equipment cabinet features three antenna connectors two for TETRA antennas A and B and one GPS antenna connector All the antenna connectors are routed from the front of the respect...

Страница 94: ...too small for the cables the cables may be damaged Connect the required antennas antenna A B and GPS to the corresponding con nectors on the top of the equipment rack refer to Figure 5 14 on page 94...

Страница 95: ...s required The alarm inputs out puts to be used can be defined through connection to the corresponding terminals The alarms are signalled with the corresponding severity via the external alarm outputs...

Страница 96: ...oved to be able to access the mounting frame The top cover of the mounting frame is secured with five mounting screws The procedure for removing the top cover of the mounting frame is described in the...

Страница 97: ...ame mounting screws 2 Remove the top cover of the mounting frame You have successfully removed the top cover of the mounting frame 5 5 3 Connecting external alarms Depending on the desired alarm signa...

Страница 98: ...f operation temporarily refer to sec tion 6 1 on page133 The connecting cables provided must comply with the site requirements The tools and aids must be available refer to section 5 5 1 on page 96 Th...

Страница 99: ...nal alarms through the corresponding grommet Figure 5 19 Mounting frame grommet top view 2 Cautiously press the lever 1 downward to open the clamps of the connectors 2 Figure 5 20 Alarm input output m...

Страница 100: ...escribed in the fol lowing Proceed as follows to mount the top cover of the mounting frame Preparation The network element must have been put out of operation temporarily refer to sec tion 6 1 on page...

Страница 101: ...ent rack grommet again Use the size PH2 Phillips head screwdriver for this purpose refer to Figure 4 4 You have successfully mounted the equipment rack top cover 5 7 Configuring the DIB 500 R4 1 The f...

Страница 102: ...e source must be switched on The procedure for switching on the voltage source depends on the circumstances at the respective installation site The procedure for switching on the voltage supply is des...

Страница 103: ...ceed as follows to switch on a network element Preparation The equipment rack must be connected to the grounding system The equipment cabinet must be connected to the voltage source at the installatio...

Страница 104: ...e service computer serially The Service and Maintenance Tool SMT is required to connect the service computer to a base station via a serial connection since the SMT establishes the connection between...

Страница 105: ...d already The service computer must have been started already The ON OFF switch es in the connection panel must be in the ON switch posi tion switch position up Carry out the following steps Connect s...

Страница 106: ...he assignments of IP addresses to hardware addresses of network adapters MAC address are stored in the ARP Address Resolution Protocol buffer To ensure that the initial download is performed properly...

Страница 107: ...figuration for an ACCESSNET T network is created based on the defined network design For this purpose the NMC 515 ConfigurationManager permits the creation and adaptation of an ACCESSNET T network mo...

Страница 108: ...n network hardware components are deliv ered the platform images have already been loaded For the initial download via the NMC 522 DownloadManager however the corresponding network hardware compo nent...

Страница 109: ...nected to the corresponding component Carry out the following steps 1 Start PuTTY by double clicking the executable file The user interface of PuTTY will be displayed Figure 5 25 PuTTY user interface...

Страница 110: ...he ethX Y configuration file will open The following output is an example ACCESSNET T Configuration File Network cta Description CTA_CFG_TL47_5_v04 Config Int Version 1 3 Network Element bs02 001 Netw...

Страница 111: ...logously for any further IP addresses The procedure for adapting the IP address has been completed 5 7 6 2 Adapting the IP addresses PowerPC For the proper operation of the PowerPC the IP address es o...

Страница 112: ...e 5 26 PuTTY user interface 2 Enter the corresponding IP address in the Host Name or IP address field refer to Table 5 12 3 Click Open The SSH connection will be established The following output is di...

Страница 113: ...dr 10 101 101 33 option lease 864000 option subnet 255 255 255 224 max_leases 1 dhcp_magkey 0x13242c8 opt bootfile autoscript img 9 Navigate to the IP address of the start entry 10 Enter the following...

Страница 114: ...DIB1_12 Software Component aeos intel_1 AEOS Intel Software Version Configuration Version 1001281502 Generated by NMC 515 ConfigurationManager 03 01 00 Date Time 28 01 2010 15 02 32 CET 10 101 101 49...

Страница 115: ...e for adapting the IP address has been completed 5 7 7 Performing an initial download via NMC 522 DownloadManager The NMC 522 DownloadManager network management client transmits the required data from...

Страница 116: ...aids to adjust a cavity combiner Service computer set up appropriately refer to the Service Computer for ACCESS NET T Requirement Manual VSWR measuring instrument recommended R S NRT R S NRT measuring...

Страница 117: ...service com puter 3 Call the prompt via the Windows main menu Start Run 4 Enter the cmd command The prompt window will be displayed Figure 5 28 Command prompt 5 Enter the command telnet 10 xxx xxx XX...

Страница 118: ...command p s sbue sbcc 02 0x 25000 to set the output power to 25 W x corresponds to carrier no The following output is displayed puc_1 BSC 10 32 36 17 5100 p s sbue sbcc 02 01 25000 SBUE SBCC 02 01 Tr...

Страница 119: ...ocedure is described in the following Measuring instrument used The procedure for impedance adjustment described below applies exclusively to the use of the recommended R S NRT VSWR measuring equipmen...

Страница 120: ...nents fitted could then be damaged Ensure that the original antenna is connected to the antenna connector above the equipment cabinet refer to Figure 5 29 Otherwise fit a dummy load 50 to the antenna...

Страница 121: ...ter output The transmitter output increases up to the maximum value and then falls back down If this happens turn the cavity coupler handwheel back in the opposite direction in order to reset the maxi...

Страница 122: ...pment and reconnect the antenna cable 15 Enter the p s sbue sbcc 02 0x XXXXX command to reset the output power to the permissible value network specific x corresponds to the carrier number XXXXX corre...

Страница 123: ...tests Service computer set up appropriately refer to the Service Computer for ACCESS NET T requirements manual Network management client NMC 511 FaultManager SMT Service and Maintenance Tool for TIB...

Страница 124: ...the NMC 511 FaultManager Provided the corresponding network component is displayed in red you have to perform a fault analysis refer to the product documentation of the NMC 511 FaultManager The functi...

Страница 125: ...flashes rapidly 100 100 ms when the voltage supply fails flashes every half second 500 500 ms during standard operation flashes every second 1000 1000 ms when the product is being shut down Shutdown...

Страница 126: ...in periodical intervals refer to Figure 5 32 Figure 5 32 TIB indicators The function test has been completed 5 9 2 4 Checking operating statuses via LEDs of the voltage supply unit optional only for...

Страница 127: ...ws to check operating statuses of the voltage supply unit Preparation The electrical connection must be made and commissioning completed Carry out the following steps 1 Check the LEDs of the system co...

Страница 128: ...po nent must be established The procedure for checking the voice channel is described in the following Checking the Voice Channel Preparation You need the tools and aids described in section 5 9 1 on...

Страница 129: ...ts with more than two Carriers For a DIB 500 R4 1 with more than two carriers the function test must be continued as described in section 5 9 3 2 on page 129 5 9 3 2 Checking the voice channel more th...

Страница 130: ...disabled bsce deblock x x corresponds to the respective carrier The check of the voice channel is complete 5 9 4 Checking the installation site of the GPS antenna To prevent damage caused by insuffic...

Страница 131: ...escribed below Proceed as follows to restore the operating condition Preparation The network element must have been put out of operation temporarily refer to sec tion 6 1 on page 133 You need the tool...

Страница 132: ...DIB 500 R4 1 Commissioning Function tests DIB 500 R4 1 132 Installation and Operation Manual 90DIB500IM02 5 2...

Страница 133: ...rocedures 6 1 Temporary service interruption To interrupt service briefly you must turn off the power supply In addition depending on the connection variant on site the equipment rack must be disconne...

Страница 134: ...down the On Off switch refer to Figure 6 1 Figure 6 1 On off switch of the DIB 500 R4 1 The network and hardware components are switched off 2 Disconnect the equipment rack from the voltage source on...

Страница 135: ...k elements The procedure for performing a permanent shutdown is described in the following Proceed as follows to perform a permanent shutdown Preparation The operation of the network element must have...

Страница 136: ...DIB 500 R4 1 Service interruption Permanent shutdown 136 Installation and Operation Manual 90DIB500IM02 5 2...

Страница 137: ...ts will automat ically be started After about three to five minutes all network and hardware compo nents have started up and are ready for operation The procedure for recommissioning after a temporary...

Страница 138: ...the disconnected physical connections must be restored The procedure for recommissioning after a permanent shutdown is described in the fol lowing Proceed as follows to recommission a network element...

Страница 139: ...products The topical state of the network components can be monitored via a connected network management client NMC 511 FaultManager For more information on the NMC 511 FaultManager please refer to th...

Страница 140: ...cement of network hardware components is described in the document entitled Service and Maintenance Manual Table 8 2 Tasks to be performed during visual inspections and intervals Task s Interval s Sit...

Страница 141: ...or this reason we recommend setting up the device cabinets of the product directly at the intended installation site Installing the transport lock The transport lock installed in the condition as supp...

Страница 142: ...truck ensure that the ground is suitable for transportation When transporting ensure that no lateral tilt of the equipment rack will occur 1 Load the equipment rack onto the means of transportation w...

Отзывы: