Rockwell Automation Publication 2198T-UM002C-EN-P - March 2019
67
Maintenance
Chapter 5
2. Remove the socket head cap screws from the curved top and bottom
bearing rails by using a 4 mm hex driver and remove the rail.
Be sure to save the two spacers with the screws.
3. Attach mover installation fixtures to the end of straight bearing rails by
using two socket head cap screws from the curved bearing rail.
Top Curved Bearing Rail
Bottom Curved Bearing Rail
Spacers
Mover Installation Fixtures
Socket head cap screws from the
curved bearing rail.
Socket head cap screws from the
curved bearing rail.
Содержание iTRAK
Страница 1: ...iTRAK System with TriMax Bearings Bulletin 2198T User Manual OriginalInstructions...
Страница 6: ...6 Rockwell Automation Publication 2198T UM002C EN P March 2019 Table of Contents Notes...
Страница 44: ...44 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 2 Track Installation Notes...
Страница 60: ...60 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 4 Power onYour System Notes...
Страница 102: ...102 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 5 Maintenance Notes...
Страница 121: ...Rockwell Automation Publication 2198T UM002C EN P March 2019 121 Index Notes...
Страница 122: ...122 Rockwell Automation Publication 2198T UM002C EN P March 2019 Index...
Страница 123: ......