36
Rockwell Automation Publication 2198T-UM002C-EN-P - March 2019
Chapter 2
Track Installation
• Proper transport, storage, mounting and installation, and care in
operation and maintenance are prerequisites for optimal and safe
operation of the system.
– Use suitable equipment for mounting and transport.
– Use proper tools and use special tools if specified.
– Use hoist equipment and tools in the correct manner.
– Avoid jamming and crushing by using safety measures.
– Do not stand under loads.
• Use the components of the system only in the manner that is defined as
appropriate. See
• Follow the safety regulations and requirements of the country in which
the system is operated.
• Only operate if the national Electromagnetic Compatibility (EMC)
regulations for the application are met.
• In accordance with EMC requirements, the machine or installation
manufacturer is responsible for compliance with the limit values as
prescribed in the national regulations.
Mount an Oval Track
To mount the oval track or oval track sections, complete these steps.
1. Calculate the weight of the track or track section.
2. Make sure that the mounting surface supports the track evenly so that it
is free of mechanical stress and distortion.
If mounting the iTRAK track directly to mounting surface, make sure
that the mounting surface has a flatness of 0.05 mm per 300 x 300 mm
(0.002 in. per 11.8 x 11.8 in.). For systems longer than 2400 mm
(94.48 in.), we recommended that you use leveling feet between iTRAK
mounting plates and the mounting surface.
3. Unpack track sections within the crate so that the lift slots are easily
accessible.
Frame Size
Weight, approx
50
123 kg/m (83 lb/ft)
100
156 kg/m (105 lb/ft)
150
189 kg/m (127 lb/ft)
IMPORTANT
Be sure that the hoist machinery can lift the load.
Содержание iTRAK
Страница 1: ...iTRAK System with TriMax Bearings Bulletin 2198T User Manual OriginalInstructions...
Страница 6: ...6 Rockwell Automation Publication 2198T UM002C EN P March 2019 Table of Contents Notes...
Страница 44: ...44 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 2 Track Installation Notes...
Страница 60: ...60 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 4 Power onYour System Notes...
Страница 102: ...102 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 5 Maintenance Notes...
Страница 121: ...Rockwell Automation Publication 2198T UM002C EN P March 2019 121 Index Notes...
Страница 122: ...122 Rockwell Automation Publication 2198T UM002C EN P March 2019 Index...
Страница 123: ......