68
Rockwell Automation Publication 2198T-UM002C-EN-P - March 2019
Chapter 5
Maintenance
4. Install or replace your mover.
5. Remove the mover installation fixtures.
6. Clean all bearing rail screws and apply fresh Loctite 243.
7. Install the spacers and the top and bottom curved bearing rails.
Torque the middle screws to 9 N•m (6.6 lb•ft) by using 4 mm hex
driver; leave the two screws on each end of the curved rail loose.
End Screws
Содержание iTRAK
Страница 1: ...iTRAK System with TriMax Bearings Bulletin 2198T User Manual OriginalInstructions...
Страница 6: ...6 Rockwell Automation Publication 2198T UM002C EN P March 2019 Table of Contents Notes...
Страница 44: ...44 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 2 Track Installation Notes...
Страница 60: ...60 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 4 Power onYour System Notes...
Страница 102: ...102 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 5 Maintenance Notes...
Страница 121: ...Rockwell Automation Publication 2198T UM002C EN P March 2019 121 Index Notes...
Страница 122: ...122 Rockwell Automation Publication 2198T UM002C EN P March 2019 Index...
Страница 123: ......