Installation
14
Operating Instructions for the TERZ 94 Electronic Turbine Meter
To reach the electrical connections on the board, you must first remove the
cover of the meter head.
To convert from the meter head directly mounted on the meter case to the
remote totalizing unit and vice versa it is necessary to change the positions of
some jumpers (see inputs and outputs in the annex).
X_S1 (and X_S2*)
X_TERZ90
Meter head mounted on meter case
3-5 and 4-6
all open
Remote totalizing unit
3-5 and 4-6
1-2 (and 3-4*)
* for 2-channel measurement only
TERZ 94:
Controlling the start-stop totalizer or resetting the resettable totalizer
(depending on the programming of the electronic totalizing unit) is performed
through input X5 terminals 1 and 2.
Jumpers
X_S1
and
X_S2
for
configuration of pulse inputs
Plug
X3
Service module
Pin connector button
on the case
Reset
(soldering pads)
Terminal
X5
Pulse inputs
Plug
X2_0
for current module
TERZ94trm and supply
Terminal block
X4
Pulse outputs
Jumper
XTERZ90
Programming keys
Содержание TERZ 94
Страница 2: ......
Страница 11: ...Safety Instructions Operating Instructions for the TERZ 94 Electronic Turbine Meter 9...
Страница 21: ...Installation Operating Instructions for the TERZ 94 Electronic Turbine Meter 19...
Страница 23: ...Installation Operating Instructions for the TERZ 94 Electronic Turbine Meter 21...
Страница 35: ...Operation Operating Instructions for the TERZ 94 Electronic Turbine Meter 33 3 Test protocol...
Страница 38: ...Operation 36 Operating Instructions for the TERZ 94 Electronic Turbine Meter All other values are not permitted...
Страница 62: ...Annex 60 Operating Instructions for the TERZ 94 Electronic Turbine Meter mode are blanked out...