Installing the remote totalizing unit
If your TERZ 94 is designed for remote totalizing, you can install the totalizing
unit at a distance of up to 50 m from the meter case. Usually, the cable has
already been connected to the sensor and the totalizing unit when the
TERZ 94 is delivered. Should this not be the case, you will have to connect
the connecting cable to Input-terminal X5, clamp 3 (+) and clamp 4 (-) of the
display board and the terminals marked “Zählwerk / Index Input“ on the
terminal head. Use only shielded cables of the type:
LIYCY - 2 x 0.75 blue
Maximum cable length: 50 m
Connect the wires of the sensor to the terminals marked ““ and
“Sensor -“ of the terminal head (make sure that the polarity is correct!).
Furthermore, you must check the plug-in jumpers XS1, XS2 and XTERZ90 on
the display board.
Settings at XS1 and XS2: jumpers 3-4
Содержание TERZ 94
Страница 2: ......
Страница 11: ...Safety Instructions Operating Instructions for the TERZ 94 Electronic Turbine Meter 9...
Страница 21: ...Installation Operating Instructions for the TERZ 94 Electronic Turbine Meter 19...
Страница 23: ...Installation Operating Instructions for the TERZ 94 Electronic Turbine Meter 21...
Страница 35: ...Operation Operating Instructions for the TERZ 94 Electronic Turbine Meter 33 3 Test protocol...
Страница 38: ...Operation 36 Operating Instructions for the TERZ 94 Electronic Turbine Meter All other values are not permitted...
Страница 62: ...Annex 60 Operating Instructions for the TERZ 94 Electronic Turbine Meter mode are blanked out...