Rinnai ENERGYSAVER RHFE-308FTR Скачать руководство пользователя страница 24

Rinnai 

24

 ES_FIM

COMPONENT ASSEMBLY & CONNECTION "ON-WALL" TERMINAL ~ ESWTKIT2

IMPORTANT

To terminate an ON-Wall terminal a connecting pipe is required, this component is created from 

sections of ESPIPE900 outer and inner pipes which is then attached to ESBEND and or ESPIPE900 

flue components. Use the diagram & table below when creating the connecting pipe sections.

C

A

A

B

D

F

G

E

E

Stopper dimple

Dimension 

(mm)

Min. Dimension 

(mm)

A

70

70

B

12

-

C

27

-

D

A + B + C

109

E

31

-

F

103

103

G

43 (B + E)

-

1. 

 

 In accordance with the measurements provided above, measure 

off  and  cut  the  outer  pipe  to  required  length 

A

  (minimum  length  is 

70mm).   Ensure that burrs and swarf are removed from all cut ends.

2. 

 

 In accordance with the measurements provided above, measure 

off and cut the inner pipe to required length 

A + B + C

 (minimum 

length is 109mm).   Ensure that burrs and swarf are removed from 

all cut ends.

3. 

 Lubricate the ‘O-Ring’ of the inner pipe of the preceding component, 

this should be either an ESBEND or an ESPIPE900.

CAUTION

 

ONLY

 use non-acidic silicone sealant between the joints 

of  PVC  flue  pipe  and  any  mating  aluminium  components 

(such as those of ESROOFCOWL) to secure and seal these 

joints against ingress of dust and water.
Silicone containing acetic acid, (characteristically having a 

vinegar odour), as the curing agent or other acids may cause 

corrosion of aluminium components and 

MUST NOT

 be 

used.

!

 Insert the cut section of inner pipe into the female socket of the 

preceding component, ensuring that it is fully home. Then insert the cut 

section of outer pipe into the female socket of the preceding component, 

ensuring it is also fully home. There should 

ONLY

 be 27mm of inner 

pipe section protruding when both inner and outer are fitted correctly.

IMPORTANT

!

   When preparing an on wall terminal ensure a continuous 

2°  fall  from  the  flue  termination  point  back  towards  the 

heater (condensate trap). This is especially important when 

an ESPIPE900 is used to horizontally extend the terminal 

location for the clearance considerations.
   Additional supports may also be required.

4. 

  Attach  the  flue  terminal  to  the  flue  adapter  using  the  three  m4 

screws supplied.

5. 

!

 

 

  With  the  orientation  arrow  is  pointing  vertically  upwards, 

attach the above terminal assembly to the connecting pipes, ensuring 

that the outer pipe hits the stopper dimples of the flue adapter. Then 

secure the terminal in place with the two 8g screws supplied. 

CAUTION

For the on wall terminal it is 

CRITICAL

 that the joints of PVC 

outer pipes are sealed with an appropriate PVC solvent.

1

2

A (70mm min)

A + B + C (109mm min) 

4

5

!

C (27mm)

Extended

horizontal

3

!

!

!

!

!

!

C (27mm)

Direct

horizontal

INSTALLATION METHODS

Содержание ENERGYSAVER RHFE-308FTR

Страница 1: ...o axial Flue System Installation Manual For Models RHFE 308FTR RHFE 309FT FT2 RHFE 556FTR FDT RHFE 557FTR RHFE 559FT FDT FT2 FDT2 RHFE 561FT FT2 RHFE 1004FT FDT RHFE 1005FT FDT FT2 FDT2 USE ONLYRINNAI GENUINE PARTS ...

Страница 2: ... by Rinnai or otherwise are NOT compatible and MUST NOT be used Rinnai appliance warranty conditions may be voided if non Rinnai flue components are fitted ONLY an authorised person MUST install service and remove the Rinnai Energysaver space heater flue system This appliance must be installed in accordance with Manufacturer s Installation Instructions Current AS NZS 3000 AS NZS 3500 AS NZS 5601 L...

Страница 3: ...Flue Installation Method 17 Under Floor Flue Installation Method 19 Cutting ESDFK ESPIPE900 ESROOFCOWL 21 Cutting components to achieve a desired length 21 Cutting components at a wall penetration 21 Component Assembly Connection ESPIPE900 21 Component Assembly Connection Wall Terminal ESDFK ESWTERM 22 Component Assembly Connection ESBEND 22 Component Assembly Connection ESCONDK 23 Component Assem...

Страница 4: ...ulations and municipal building codes including local OH S requirements Flue components MUST be installed correctly by an appropriately licensed tradesperson The installation of gas water and electricity MUST conform to local regulations All dimensions referred to in these instructions are in millimetres unless otherwise specified These instructions ONLY apply to the Rinnai Energysaver co axial fl...

Страница 5: ...fic installation OBSERVE CORRECT ORIENTATION Where specified ensure that components are installed with the correct vertical or horizontal orientation LUBRICATE Use the supplied container of silicon grease to lubricate components DO NOT use other lubricants as these may damage the flue components SECURE Where specified secure components with either installer provided or component supplied fixings D...

Страница 6: ...ll or external corner 300 d From a gas meter M see 5 11 5 9 for vent terminal location of regulator see Table 6 6 for New Zealand requirements 1000 e From an electricity meter or fuse box P 500 500 f From a drain pipe or soil pipe 75 g Horizontally from any building structure or obstruction facing a terminal h From any other flue terminal cowl or combustion air intake 300 Appliances up to 150 MJ h...

Страница 7: ...y it is recommended that a mat be placed in front of the appliance extending at least 750mm in front of it The flue terminal MUST BE positioned away from flammable materials In areas subject to heavy snowfall keep snow clear of flue terminal at all times DO NOT flue into natural draught flues or fireplaces DO NOT flue into other rooms roof spaces or into under floor spaces DO NOT Install the heate...

Страница 8: ...he wall The lower end point of the arc iv will be the lower limit of the minimum horizontal and vertical centre of penetration G The upper end point of the arc v will the be the upper limit of the minimum horizontal and vertical centre of penetration G D E F iii vi vii G i ii 5 From the arc axis iii use the measurements F D E from Table 1 to draw an arc on the wall The lower end point of the arc v...

Страница 9: ... appliance 426 465 750 550 545 760 930 930 ii Centre Line of appliance 213 233 375 275 273 380 465 465 iii Arc axis Axis point of the flue elbow No dimension A Horizontal dim Centre Line to arc centre 110 132 220 172 172 207 305 356 B Vertical dim base to arc centre 265 265 215 264 267 247 165 129 C Minimum horizontal limit of arc 150 150 240 200 200 240 325 376 D Minimum vertical limit of arc 270...

Страница 10: ... Roof Cowl ESDFK ESPIPE900 ESBEND ESCONDK ESROOFCOWL Direct Flue Kit Co Axial Pipe 900mm Bend 2 x 45º Condensate Trap Wall Terminal Kit ESDFK ESPIPE900 ESBEND ESCONDK ESWTKIT2 IN WALL Components Option A Direct ESFKITIW Option B Offset ESFKITIW ESBEND In Wall Adaption Kit Co Axial Pipe 900mm x 4 Roof Cowl ESKIT03 ESPIPE900 ESROOFCOWL In Wall Adaption Kit Co Axial Pipe 900mm x 4 Bend 2 x 45º Roof C...

Страница 11: ...ue terminal extension will count as one of the THREE 3 allowed bends of a flue run Note 4 Where stipulated a Minimum 2 fall is required to ensure correct drainage of condensation formed in the discharge flue IMPORTANT See Note 4 Min 2 fall towards the flue Terminal See Note 4 Min 2 fall towards the flue Terminal See Note 4 Min 2 fall towards the flue Terminal See Note 4 Min 2 fall towards the flue...

Страница 12: ... Silicon Grease Wall Clip Grommet Use with 1004 1005 Drain Tube Co Ax Vertical Terminal Co Ax Pipe x4 Pipe Locating Spacer ESFKITIW Flue Kit In Wall ESWTKIT2 On Wall Terminal Kit ESWTERM Mounting Securing Screws 7mm x2 22mm x6 Flue Terminal External Wall Plate ESCONDK Condensate Trap Kit Condensation Trap Drain Tube ESPLATE External Wall Plate Mounting Securing Screws 22mm x3 7mm x2 ESPIPE900 Co A...

Страница 13: ...k and 100mm to combustible surfaces such as plaster Allow for a continuous 2 fall from the heater connection point to the wall terminal 2 Slide the internal wall plate over the terminal end of the ESDFK pipe until it is nested on the raised ring of the flue transition 3 Pass the ESDFK through the internal wall penetration until the internal wall plate is flush with the wall 4 Create the wall termi...

Страница 14: ...n the raised ring of the flue transition Join ESPIPE900 to ESDFK Fit additional lengths of ESPIPE900 as required CAUTION The joints between ESDFK and ESPIPE900 and any additional ESPIPE900 lengths MUST be secured by a pop rivet or screw through the outer Co Axial pipes to prevent accidental or erroneous dislodgement ESDFK and ESPIPE900 DO NOT require cutting to be joined Cutting of components is n...

Страница 15: ...l these joints against ingress of dust and water ONLY use non acidic silicone sealant between the joints of outer PVC flue pipes and any mating aluminium components such as the condensate trap to secure and seal these joints against ingress of dust and water Silicone containing acetic acid vinegar or other acids as the curing agent may cause corrosion of aluminium components and MUST NOT be used S...

Страница 16: ...ingress of dust and water ONLY use non acidic silicone sealant between the joints of outer PVC flue pipes and any mating aluminium components such as the condensate trap to secure and seal these joints against ingress of dust and water Silicone containing acetic acid vinegar or other acids as the curing agent may cause corrosion of aluminium components and MUST NOT be used Secure the vertical flue...

Страница 17: ...o Axial pipes and flue pipes are to be clipped to the wall using the stand off clips supplied or other suitable method Steps for creating a Sideways flue installation are as follows 1 Using a drill remove the pop rivet used to fasten the straight flue pipe connection pipe to the flue transition of ESDFK and remove but DO NOT discard the straight flue pipe connection 2 Fit the elbowed flue pipe con...

Страница 18: ... this stage 13 Fit additional lengths of ESPIPE900 as required CAUTION The joints between ESPIPE900 lengths MUST be secured by a pop rivet or screw through the outer Co Axial pipes and flue pipes are to be clipped to the wall using the stand off clips supplied or other suitable method ESDFK and ESPIPE900 DO NOT require cutting to be joined 14 Create the wall penetration s in accordance with the se...

Страница 19: ...of ESDFK and remove but DO NOT discard the straight flue pipe connection 2 Fit the elbowed flue pipe connection supplied with the Back Cover kit to the flue transition pushing it fully home and then fasten in place with the grub screw supplied using an Allen key The grub screw terminates in a groove in the flue transition When fastened this prevents accidental dislodgement of the pipe connections ...

Страница 20: ...d position relative to the wall DO NOT secure the heater at this stage 11 If required create a wall penetration s in accordance with the section Wall Penetrations on page 10 The minimum diameter required for wall the penetration for ESPIPE900 is 80mm Allow for a continuous 2 fall from the heater connection point from to the wall penetration CAUTION Of special relevance to under floor installations...

Страница 21: ...4 Ensure all burrs and swarf are removed from all cut ends Cutting components at a wall penetration 1 Measure and mark off the outer pipe at a point flush with the surface of the wall penetrated CC PLUS an additional 50mm DD CAUTION The minimum length ZZ of ESDFK when measured from the back plate of the casting MUST NOT be less than 300mm when joining to other components 2 Cut the outer pipe to th...

Страница 22: ...ntal holes and the two 7mm screws provided 2 Carefully cut through the outer and inner pipes of the flue protrusion as close to the external wall plate as possible Take care to avoid cutting the external wall plate and keep the cuts of both internal and external pipes as parallel as possible All burrs and swarf are to removed from all cut ends 3 Align the arrows of the metal mushroom flue terminal...

Страница 23: ...ve the correct orientation of ESCONDK The arrow symbol MUST point away from the heater towards the termination of the flue system Lubricate all inner pipe O Rings with the silicone grease provided CAUTION A condensate drain MUST be connected for all In Wall installations for details see Connecting Condensate Drain Tube To Heater on page 30 COMPONENT ASSEMBLY CONNECTION ESROOFCOWL CAUTION Both the ...

Страница 24: ...aining acetic acid characteristically having a vinegar odour as the curing agent or other acids may cause corrosion of aluminium components and MUST NOT be used Insert the cut section of inner pipe into the female socket of the preceding component ensuring that it is fully home Then insert the cut section of outer pipe into the female socket of the preceding component ensuring it is also fully hom...

Страница 25: ...H 2 Remove the screw from the front of the transition casting retain and DO NOT discard and slide the wall spacer plate over the transition casting so that the folded tab is facing both down and to the rear Using the screw removed from the front of the transition casting attach the mounting strip across the front of the transition casting Lubricate the O Ring of the condensate trap and attach this...

Страница 26: ...ng towards the heater fit the required lengths of ESPIPE900 to reach but not pass through the top plate lubricating the O Rings of each additional ESPIPE900 length before fitting When this point is reached secure the top plate bracket over the hole in the top plate 5 Continue Flueing to the termination point and fit an ESROOFCOWL observing the clearances and regulations refer to page 4 To avoid ob...

Страница 27: ... WARNING AT NO TIME MUST THE AIR INTAKE HOSE BE CUT OR SHORTENED 7 7 8 Air intake hose Air intake hose Move the right hand vermin plate along the hose until it is flush against the wall then secure in place with three of the nine screws provided 8 Screw the left hand vermin plate to the right hand vermin plate when overlapped correctly the holes in both plates will be aligned using three of the ni...

Страница 28: ...fit to the exhaust pipe of the heater Push the exhaust pipe fully home so that the end of the exhaust connection and the collar of the exhaust pipe are fully mated IMPORTANT For 1004 and 1005 models an additional flue component Flue Adaptor is supplied with the heater which steps down the larger diameter heater exhaust to that used by the exhaust connection on the flue system 2 Attach the flue loc...

Страница 29: ...whilst the finger tabs are secured around the collar of the fixed flue spigot applies to models 556 557 1004 CAUTION This joint MUST be properly secured in accordance with these instructions using the flue lock provided when applicable If the joint is not properly secured products of combustion could disperse into the room being heated Which may result in a dangerous condition CONNECTING COMBUSTIO...

Страница 30: ...innai part number 90180944 2 90 120 RHFE 308FTR 75 120 RHFE 309FT FT2 65 80 RHFE 556FTR FDT 115 120 RHFE 557FTR RHFE 561FT FT2 80 RHFE 559FT FDT FT2 FDT2 115 Dim B Dim A Dim A Dim B RHFE 1004FTR FDT 510mm 135mm 500mm 100mm Heat Shields Heat Shield Heat Shield Heat Shield Heat Shield Heat Shield Back panel Back panel Back panel Back panel Back panel Back panel RHFE 1005FT FDT FT2 FDT2 Drill the low...

Страница 31: ...Rinnai 31 ES_FIM NOTES ...

Страница 32: ...or public phones For further information visit www rinnai com au or email enquiry rinnai com au Rinnai has a Service and Spare Parts network with personnel who are fully trained and equipped to give the best service on your Rinnai appliance If your appliance requires service please call our National Help Line Rinnai recommends that this appliance be serviced every 2 years With our policy of contin...

Отзывы: