31
20081825
GB
Installation
5.12.6 Hydraulic circuit diagram
Key
(Fig. 27 on page 31)
1
Pump suction
2
Pump return line and nozzle return line
3
Pump by-pass screw
4
Pump pressure regulator
5
Safety valve
6
Safety valve
7
Nozzle delivery line
8
Nozzle without interception rod
9
Nozzle return line
10 Pressure variator on nozzle return line
11 Pressure variator servomotor
12 Pressure switch on nozzle return line
13 Safety valve on nozzle return line
14 Safety valve on nozzle return line
15 Pressure switch on pump delivery line
B
Oil valve group and pressure variator
M
Pressure gauges
V
Vacuometer connection
OPERATION
Pre-purging phase
:
valves 5), 6), 13) and 14) closed.
Ignition and operation phase
:
valves 5), 6), 13) and 14) open.
Stop:
All valves closed.
WARNING
The a.m. operation is possible because the pump
is already full of fuel when it leaves the factory. If
the pump has been drained, fill it with fuel through
the opening on the vacuometer 4)(Fig. 25 on page
30) prior to starting; otherwise, the pump will
seize.
Whenever the length of the suction piping ex-
ceeds 20-30 meters, the supply line must be filled
using a separate pump.
Fig. 27
20086806
Содержание RLS 310/E MX
Страница 2: ...Original instructions ...
Страница 81: ...79 20081825 GB Appendix Electrical panel layout RLS 310 410 E MX 230 400V Direct Start Up ...
Страница 82: ...20081825 80 GB Appendix Electrical panel layout RLS 310 410 510 610 E MX 400V Star Triangle Start Up ...
Страница 84: ...20081825 82 GB Appendix Electrical panel layout ALL MODELS ...
Страница 85: ...83 20081825 GB Appendix Electrical panel layout 0 ALL MODELS ...
Страница 87: ...85 20081825 GB Appendix Electrical panel layout ALL MODELS ...
Страница 94: ......
Страница 95: ......