21
20081825
GB
Technical description of the burner
4.15.1 List of the phases (gas operation)
4.15.2 List of the phases (light oil operation)
4.16
Operator panel operation
The control box LMV 26... is connected directly to the operator
panel (Fig. 10 on page 21).
The buttons allow you to programme the operation and diagnos-
tics menus.
The burner management system is shown on the LCD display
(Fig. 11 on page 22). To simplify the diagnostics, the display
shows the operating status, type of problem, and when the prob-
lem arose.
Phase
Description
Ph00
Lockout phase
Ph02
Safety phase
Ph10
Closing paused
Ph12
Standby
Ph22
Fan motor(MV) = ON
Safety valve (VS) = ON
Ph24
The burner moves to the pre-purging position
Ph30
Pre-purging time
Ph36
The burner moves to the ignition position
Ph38
Ignition phase (TA) = ON
Ph39
Minimum gas pressure switch test (PGmin.)
Ph40
Fuel valve (V) = ON
Ph42
Ignition (TA) = OFF
Ph44
t44 = interval time 1
Ph60
Operation
Ph62
The burner moves to the switching off position
Ph70
t13 = post-combustion time
Ph72
The burner moves to the post-purging position
Ph74
t8 = post-purging time
Ph78
t3 = post-purging time
Ph80
emptying time (valve leak detection)
Ph81
Atmospheric time test (valve leak control)
Ph82
filling time (valve leak detection)
Ph83
pressure test time (valve leak detection)
Ph90
Standby time due to lack of gas
Phase
Description
Phase
Description
Ph00
Lockout phase
Ph02
Safety phase
Ph10
Closing paused
Ph12
Standby
Ph22
Fan motor(MV) = ON
Pump motor (MP) = ON
Safety valve (SVOIL) = ON
Test maximum oil pressure switch (POilmax)
Ph24
The burner moves to the pre-purging position
Ph30
Pre-purging time
Ph36
The burner moves to the ignition position
Ph38
Ignition phase (TA) = ON
Test minimum oil pressure switch (POilmin)
Ph40
Fuel valve (V) = ON
Ph42
Ignition (TA) = OFF
Ph44
t44 = interval time 1
Ph60
Operation
Ph62
The burner moves to the switching off position
Ph70
t13 = post-combustion time
Ph72
The burner moves to the post-purging position
Ph74
t8 = post-purging time
Ph78
t3 = post-purging time
Phase
Description
WARNING
Observe the procedures and adjustments
shown below.
All interventions (assembly and installation
operations, assistance, etc.) must be carried
out by qualified personnel.
If the display and operator panel are dirty,
clean them with a dry cloth.
Protect the panel from excessive tempera-
tures and liquids.
D9001
Fig. 10
Содержание RLS 310/E MX
Страница 2: ...Original instructions ...
Страница 81: ...79 20081825 GB Appendix Electrical panel layout RLS 310 410 E MX 230 400V Direct Start Up ...
Страница 82: ...20081825 80 GB Appendix Electrical panel layout RLS 310 410 510 610 E MX 400V Star Triangle Start Up ...
Страница 84: ...20081825 82 GB Appendix Electrical panel layout ALL MODELS ...
Страница 85: ...83 20081825 GB Appendix Electrical panel layout 0 ALL MODELS ...
Страница 87: ...85 20081825 GB Appendix Electrical panel layout ALL MODELS ...
Страница 94: ......
Страница 95: ......