111
ENGLISH
b
Indoors
Power supply
Please use the shielded wire, and the shield layer must be grounded.
On/Off switch
Fuse
Distribution box
Distribution box
Distribution box
Distribution box
Fuse
Fuse
Fuse
L N
L N
L N
L N
Master unit
Slave unit 1
H1 H2
Slave unit 2
H1 H2
Slave unit x
H1 H2
Build-out resistor
Only the last IDU
requires adding the
network adapting
wire at H1 and H2.
......
SW9
Power supply
Please use the shielded wire, and the shield layer must be grounded.
On/Off switch
Fuse
Distribution box
Distribution box
Distribution box
Distribution box
The cascade system electrical control system connection diagram(3N~)
Master unit
Slave unit 1
H1 H2
Slave unit 2
H1 H2
Slave unit x
H1 H2
Build-out resistor
Only the last IDU
requires adding the
network adapting
wire at H1 and H2.
......
SW9
L1 L2 L3 N
Fuse
L1 L2 L3 N
Fuse
L1 L2 L3 N
Fuse
L1 L2 L3 N
The cascade system electrical control system connection diagram(1N~)
ON
OFF
SW9
Slave unit
Master unit
ON
OFF
SW9
Slave unit
Master unit
ATTENTION
1) The cascade function of the system only supports 6 machines at most.
2) In order to ensure the success of automatic addressing, all machines must be connected to the same power supply and powered on unifor
-
mly.
3) Only the Master unit can connect the controller, and you must put the SW9 to “on” of the master unit, the slave unit cannot connect the con
-
troller .
4) Please use the shielded wire, and the shield layer must be grounded.
Содержание 20191845
Страница 72: ...74 ITALIANO ...