12
INStAllAtION
—
use the pipe locking bracket to space the unit lower side
from the metallic support
If there is a connection box:
—
use one of the polystyrene protections from the packaging
After performing the connections:
—
hook the unit lower part
—
by pushing it perpendicularly toward the metallic support
2.10
Condensate discharge position
The hole for the condensate drain is provided as standard on the
left side looking back on the unit.
It is possible to move it to the right-hand side. To do so, proceed
as follows:
1
Protective cap
1
1
—
remove the protection plug from the prearranged connec-
tion on the right-hand side
1
Drainage pipe
2
Condensation discharge
1
2
—
remove the drainage pipe on the left-hand side and place
it on the right-hand side
—
fit the protection plug on the spare hole on the left-hand
side
2.11
Refrigerating connection
The dimensions and positions of
R
AMW P
cooling connec-
tions are shown hereunder.
1
Gas line connection
2
Liquid line connection
2
1
Model
20
25
35
50
70
Connections
Liquid line
connection
1/4”
Inches
Gas line
connection
3/8”
1/2”
Inches
Liquid line
connection
6,35
mm
Gas line
connection
9,52
12,7
mm
Connection outlet directions are indicated below.
A
A
A
B
B
In case of connection in directions A:
—
remove the relevant pre-trimmed part on the cover cab-
inet
In case of connection in directions b:
Содержание 20127839
Страница 1: ...AMW P SERIES R32 06 2018 cod Doc 0083009 rev 3 EN INSTALLATION AND TECHNICAL SERVICE INSTRUCTIONS...
Страница 25: ......
Страница 26: ......
Страница 27: ......