![Riello 20127839 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/riello/20127839/20127839_installation-and-technical-service-instructions_1460009011.webp)
11
INStAllAtION
—
drill holes in the marked positions
—
fix the metallic support with the screws and the wall plugs
9
Check that the installation is horizontal using a water level.
Drilling into the wall:
A
Inner side
B
Outer side
1
Hole protective insert, supplied
2
Plastic tube
5 - 6 mm
A
1
2
B
—
drill the through hole into the wall
—
keep a downward inclination toward the external side
—
insert a plastic tube in the hole in order to protect the con-
nections
—
introduce the supplied hole protection insert on the inter-
nal side of the wall
—
seal with stucco
9
In case of connections on the rear side of the unit, refer to
chapter "Refrigerating connection"
p. 12 for the position
of the hole.
leak test:
The unit is supplied as pre-charged with nitrogen.
1
Liquid pipe
2
Gas pipe
3
Gas connection plug
4
Pressure presence indicator
5
Fluid connection plug
1
2
3
4
5
—
ensure that pressure presence indicator is protruding
—
partially loosen one fitting plug
—
check for nitrogen leaks to verify that there is pressure in-
side the device
9
If pressure indicator is not protruding, do not continue in-
stallation and check for leakage inside the unit.
9
Contact
R
Technical Support Service.
Device preparation:
1
Pipe locking bracket
2
Motor-driven deflector locking insert
2
1
—
remove the motor-driven deflector locking inserts
—
lift the pipe locking bracket
Assembly:
—
fasten the unit to the upper part of the metallic support
—
check that the unit is correctly hooked by moving it to the
left and to the right
—
place the unit in the middle of the metallic support
To ease the connections:
1
Pipe locking bracket
2
Packaging polystyrene protection
1
2
Содержание 20127839
Страница 1: ...AMW P SERIES R32 06 2018 cod Doc 0083009 rev 3 EN INSTALLATION AND TECHNICAL SERVICE INSTRUCTIONS...
Страница 25: ......
Страница 26: ......
Страница 27: ......