5010e_513.doc / 22.01.10
2 INSTALLATION
2.1 DELIVERY
Check the device and contents of the enclosed box as follows on visible transport damages and completeness:
1 Operator’s
Manual
1 Aspiration
tube
1
Axis printer paper
1 Dust
cover
2
Fuses for line power
1 Mains
cable
2 Printer
paper
1
Pump tube with joints
1
Ribbon band printer
1
Standard cuvette adaptor
1
Top cover small for printer
1 Waste
tube
Inform the sales office immediately about transport damages. Keep the original packaging for a possible
return.
2.2
PREPARATION FOR INSTALLATION
Place the device on a stable, level surface. Do not obstruct the input air at the bottom and the waste air at the
back plate to guarantee the ventilation of the device.
If the device was exposed to extraordinary fluctuation in temperature and/or humidity, it must acclimatize suffi-
ciently before operation.
Before connecting the waste tube to the pump tube remove pump tube at both ends from the metal
clamps. The waste tube of the flow-through system must be led through the tunnel to the backside of the device
(chapter 3.2 - BACK) and then into any drain tank.
2.3 INSTALLATION
Photometer
5010
operates at any line voltage between 90 V
AC
and 264 V
AC
at 50/60 Hz. The device plug of the
mains cable must be put into the socket at the back of the device and the mains plug into a grounded mains
socket.
While connecting or disconnecting an external device (PC, printer) to Photometer
5010
both devices
must be switched off.
Switch on Photometer
5010
by the mains switch at the back.
Greeting screen:
After switching on copyright, website, type of
device and version designation are displayed
and - in the case of activated printer - printed
out.
( c ) R O B E R T R I E L E
G m b H & C o K G
P H O T O M E T E R 5 0 1 0
V 5 . 1 3 a 0 2 / 0 9 / 0 9 D
w w w . r i e l e . d e
ROBERT RIELE GmbH & Co KG
Page 8
2 - INSTALLATION