PROCEDURES
June 2/08
9101
3 - 5
1.
Remove the packed liferaft in its valise/container from the vessel.
Caution:
Do not pull or jerk the painterline as this may cause operation of the
inflation system. Inadvertent activation of the inflation system may cause
personal injury or damage to raft components.
2.
Remove the liferaft from the valise/container as follows:
Container
Disconnect the taped painterline from the outside of the container. Carefully cut the container
straps (IPL Fig. 1, Item 180), taking care to follow the safety precautions detailed. (See Fig.1)
Remove the top half of the container, dislodge the exit plug, and locate the attachment point of
the painterline to the liferaft. Remove and discard the adhesive tape and untie the painterline
from the outside loop patch on the vacuum bag (IPL Fig. 1, Item 150). (See Fig. 2 & Detail A)
Carefully pass the end of the painterline back through the inflation valve pull cable loop (IPL Fig.
3, Item 190). Firmly hold the inflation valve pull cable loop, then, WITH CARE, gently remove the
painterline from it. Take off the painterline sachet (IPL Fig. 1, Item 140) after everything has
been disconnected and place it to the side. (See Fig. 3)
Valise
Carefully pull open the fasteners on the valise. Remove and discard the adhesive tape from
around the knot on the velcro painterline patch and untie. Locate the attachment point of the
painterline to the liferaft, remove and discard the adhesive tape, and untie the painterline from
the outside loop patch on the vacuum bag. (See Fig.2 & Detail A)
Carefully pass the end of the painterline back through the inflation valve pull cable loop. Firmly
hold the inflation valve pull cable loop, then, WITH CARE, gently remove the painterline from it.
Take off the painterline sachet after everything has been disconnected and place it to the side.
(See Fig. 3)
Warning:
Although the painterline is now disconnected from the inflation system,
the inflation system is still charged and armed. Maintain caution while
handling any part of the inflation system, with special attention to the
inflation valve pull cable.
3.
Carefully lift the liferaft out of the valise/container, lay it on a prepared working area. Unscrew
the vacuum retainer (IPL Fig. 3, Item 220) with torque spanner wrench (Part No. 338-009).
Remove vacuum retainer and vacuum washer (IPL Fig. 3, Item 210) (See Detail B). Cut the
vacuum bag and CAREFULLY remove the liferaft, making sure not to pull on the inflation valve
toggle pull cable in the process. DO NOT REUSE VACUUM PACK DURING REPACK. (See Fig. 4)
Содержание 45-AE4V
Страница 2: ......
Страница 4: ...June 2 08 RR 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 6: ......
Страница 8: ...June 2 08 SB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ......
Страница 19: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9101 AP 1 AP None Listed...
Страница 20: ...June 2 08 AP 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...June 2 08 AB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...June 2 08 TC 2 9101 THIS PAGE IN INTENTIONALLY LEFT BLANK...
Страница 26: ...June 2 08 1 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 30: ...June 2 08 2 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 32: ...FIGURE 1 COASTAL AND AERO ELITE Oct 21 16 2 4 9101...
Страница 33: ...FIGURE 2 OFFSHORE ELITE June 2 08 9101 2 5...
Страница 34: ...June 2 08 2 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 39: ...FIGURE 3 VALISE AND CONTAINER June 2 08 9101 2 11...
Страница 40: ...FIGURE 4 INFLATION SYSTEM June 2 08 2 12 9101...
Страница 44: ...July 13 11 2 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 46: ...FIGURE 5 DEPLOYMENT July 13 11 2 18 9101...
Страница 47: ...DISASSEMBLY June 2 08 9101 3 1 3 General 3 Procedures 5...
Страница 48: ...June 2 08 3 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...June 2 08 3 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 54: ...FIGURE 2 REMOVAL FROM CONTAINER VALISE June 2 08 3 8 9101...
Страница 55: ...FIGURE 3 DISCONNECTING THE PAINTERLINE June 2 08 9101 3 9...
Страница 56: ...FIGURE 4 REMOVAL FROM VACUUM BAG July 13 11 3 10 9101...
Страница 57: ...FIGURE 5 UNFOLD RAFT DISENGAGE THE CYLINDER June 2 08 9101 3 11...
Страница 58: ...June 2 08 3 12 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9101...
Страница 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9101...
Страница 66: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9101...
Страница 73: ...FIGURE 1 LEFT CHAMBER INFLATION COASTAL July 13 11 9101 4 15...
Страница 74: ...FIGURE 3 UPPER CHAMBER INFLATION OFFSHORE June 2 08 4 16 9101...
Страница 75: ...FIGURE 5 DIGITAL MANOMETER Feb 20 13 9101 4 17...
Страница 76: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 18 9101...
Страница 81: ...CLEANING June 2 08 9101 5 1 5 General 3 Procedures 5 A Liferafts 5 B Rigid Container 5 C Valise 5...
Страница 82: ...June 2 08 5 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 84: ...June 2 08 5 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 86: ...June 2 08 5 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 88: ...June 2 08 6 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 90: ...June 2 08 6 4 9101 THIS PAGE INITIALLY LEFT BLANK...
Страница 92: ...June 2 08 6 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 94: ...June 2 08 6 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 96: ...June 2 08 6 10 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 98: ...June 2 08 7 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 100: ...June 2 08 7 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9101 7 13...
Страница 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM July 13 11 7 14 9101...
Страница 112: ...June 2 08 7 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 114: ...June 2 08 8 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 116: ...June 2 08 8 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 119: ...FIGURE 2A SEA ANCHOR PREPARATION June 2 08 9101 8 7 FIGURE 2B STOWING PAINTERLINE...
Страница 120: ...FIGURE 3 CONTAINER SPECIFICATIONS June 2 08 8 8 9101...
Страница 122: ...FIGURE 4B 120in TIE LINE CONNECTION July 13 11 8 10 9101...
Страница 140: ...FIGURE 5 TOPPING OFF INFLATE DEFLATE VALVE July 13 11 8 28 9101...
Страница 141: ...FIGURE 7 STOWAGE OF COMPONENTS June 2 08 9101 8 29...
Страница 143: ...FIGURE 8B FOLDING DIAGRAM STEP 2 July 13 11 9101 8 31...
Страница 144: ...FIGURE 8C FOLDING DIAGRAM STEP 3 July 13 11 8 32 9101...
Страница 146: ...FIGURE 8E FOLDING DIAGRAM STEP 5 Feb 20 13 8 34 9101...
Страница 147: ...FIGURE 8F FOLDING DIAGRAM STEP 6 July 13 11 9101 8 35...
Страница 148: ...FIGURE 8G FOLDING DIAGRAM STEPS 7 8 July 13 11 8 36 9101...
Страница 149: ...FIGURE 9 BURST STRAP ATTACHMENT July 13 11 9101 8 37...
Страница 150: ...FIGURE 10 GASKET REMOVAL July 13 11 8 38 9101...
Страница 151: ...FIGURE 12 ATTACHMENT OF MOORING PAINTERLINES July 13 11 9101 8 39...
Страница 152: ...FIGURE 14 SEALING BAG July 13 11 8 40 9101...
Страница 153: ...FIGURE 15A PLACING BAG IN VALISE July 13 11 9101 8 41...
Страница 154: ...FIGURE 16 INFLATION VAVE PAINTERLINE CONNECTION June 2 08 8 42 9101...
Страница 155: ...FIGURE 18 CONTAINER STRAPS Feb 20 13 9101 8 43 FIGURE 19 HEAT SHRINK SLEEVES...
Страница 156: ...FIGURE 20 TAPE FOR STRAPS AND PAINTERLINE Feb 20 13 8 44 9101...
Страница 157: ...STORAGE June 2 08 9101 9 1 9 General 3...
Страница 158: ...June 2 08 9 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 160: ...June 2 08 9 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 161: ...TOOL EQUIPMENT AND MATERIALS Feb 20 13 9101 10 1 10 General 3 Tool List 5...
Страница 162: ...June 2 08 10 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 164: ...June 2 08 10 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 168: ...Feb 20 13 10 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ...June 2 08 11 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 174: ...June 2 08 11 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 176: ...June 2 08 11 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 182: ...Feb 20 13 11 14 9101...
Страница 186: ...FIGURE 2 CYLINDER VALVE ASSEMBLY June 2 08 11 18 9101...
Страница 188: ...FIGURE 3 INFLATION VALVE ASSEMBLY June 2 08 11 20 9101...
Страница 190: ...FIGURE 4 CONTAINER ASSEMBLY July 13 11 11 22 9101...
Страница 192: ...FIGURE 5 SURVIVAL EQUIPMENT PACK June 2 08 11 24 9101 Please refer to Image List for component visuals...
Страница 204: ...Feb 20 13 11 36 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 205: ...SPARE PARTS LIST Feb 20 13 9101 12 1 12 Introduction 3 Image List 5 Tool Image List 21...
Страница 206: ...Feb 20 13 12 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 208: ...Feb 20 13 12 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 229: ...Feb 20 13 9101 12 25 Description Part Number O Ring Install Kit 95 EOIK34...
Страница 230: ...Feb 20 13 12 26 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 232: ...July 13 11 9101 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 234: ......