Feb 20/13
9101
7 - 9
Revere Supply Company cannot offer partial or complete panel/tube replacement. It
will be necessary to replace the liferaft should significant damage occur to the panels
or tubes.
Repair Limits for External Patches
A.
Patching of the buoyancy tubes is permitted, but there must not be more than 10 patches
per panel, and the area of the 10 patches together must not exceed 25% of the panel area.
B.
In the floor and ballast pockets, 4 patches per panel are permitted, but the area of these
patches together must not exceed 25% of the panel area. In the canopy, patches are
permitted up to a maximum of 50% of the panel area.
C.
If minor damage occurs to the seam between the floor and the buoyancy tube a patch may
be fitted providing that is complies with the limits specified below. In this instance the floor
seam must be opened, the floor repaired, the floor seam re-made, and the patch fitted of
the remaining damaged area.
D.
A repair patch may be fitted if it complies with the following:
(1)
The maximum aspect (length to width) ratio must not be greater the 3:1.
(2)
The peripheral length of a patch must not be greater than 40% of the tube
circumference.
(3)
A patch MUST NOT be fitted under, or adjacent to, a major anchorage point.
(4)
The maximum area of a patch must not exceed one eighth of the total panel area.
(5)
The hole or tear lies at least 1in. away from the edge of a seam.
Note:
After repairs have been made, components are required to be retested to
confirm they are in proper working order.
Содержание 45-AE4V
Страница 2: ......
Страница 4: ...June 2 08 RR 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 6: ......
Страница 8: ...June 2 08 SB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ......
Страница 19: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9101 AP 1 AP None Listed...
Страница 20: ...June 2 08 AP 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...June 2 08 AB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...June 2 08 TC 2 9101 THIS PAGE IN INTENTIONALLY LEFT BLANK...
Страница 26: ...June 2 08 1 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 30: ...June 2 08 2 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 32: ...FIGURE 1 COASTAL AND AERO ELITE Oct 21 16 2 4 9101...
Страница 33: ...FIGURE 2 OFFSHORE ELITE June 2 08 9101 2 5...
Страница 34: ...June 2 08 2 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 39: ...FIGURE 3 VALISE AND CONTAINER June 2 08 9101 2 11...
Страница 40: ...FIGURE 4 INFLATION SYSTEM June 2 08 2 12 9101...
Страница 44: ...July 13 11 2 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 46: ...FIGURE 5 DEPLOYMENT July 13 11 2 18 9101...
Страница 47: ...DISASSEMBLY June 2 08 9101 3 1 3 General 3 Procedures 5...
Страница 48: ...June 2 08 3 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...June 2 08 3 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 54: ...FIGURE 2 REMOVAL FROM CONTAINER VALISE June 2 08 3 8 9101...
Страница 55: ...FIGURE 3 DISCONNECTING THE PAINTERLINE June 2 08 9101 3 9...
Страница 56: ...FIGURE 4 REMOVAL FROM VACUUM BAG July 13 11 3 10 9101...
Страница 57: ...FIGURE 5 UNFOLD RAFT DISENGAGE THE CYLINDER June 2 08 9101 3 11...
Страница 58: ...June 2 08 3 12 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9101...
Страница 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9101...
Страница 66: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9101...
Страница 73: ...FIGURE 1 LEFT CHAMBER INFLATION COASTAL July 13 11 9101 4 15...
Страница 74: ...FIGURE 3 UPPER CHAMBER INFLATION OFFSHORE June 2 08 4 16 9101...
Страница 75: ...FIGURE 5 DIGITAL MANOMETER Feb 20 13 9101 4 17...
Страница 76: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 18 9101...
Страница 81: ...CLEANING June 2 08 9101 5 1 5 General 3 Procedures 5 A Liferafts 5 B Rigid Container 5 C Valise 5...
Страница 82: ...June 2 08 5 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 84: ...June 2 08 5 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 86: ...June 2 08 5 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 88: ...June 2 08 6 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 90: ...June 2 08 6 4 9101 THIS PAGE INITIALLY LEFT BLANK...
Страница 92: ...June 2 08 6 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 94: ...June 2 08 6 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 96: ...June 2 08 6 10 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 98: ...June 2 08 7 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 100: ...June 2 08 7 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9101 7 13...
Страница 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM July 13 11 7 14 9101...
Страница 112: ...June 2 08 7 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 114: ...June 2 08 8 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 116: ...June 2 08 8 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 119: ...FIGURE 2A SEA ANCHOR PREPARATION June 2 08 9101 8 7 FIGURE 2B STOWING PAINTERLINE...
Страница 120: ...FIGURE 3 CONTAINER SPECIFICATIONS June 2 08 8 8 9101...
Страница 122: ...FIGURE 4B 120in TIE LINE CONNECTION July 13 11 8 10 9101...
Страница 140: ...FIGURE 5 TOPPING OFF INFLATE DEFLATE VALVE July 13 11 8 28 9101...
Страница 141: ...FIGURE 7 STOWAGE OF COMPONENTS June 2 08 9101 8 29...
Страница 143: ...FIGURE 8B FOLDING DIAGRAM STEP 2 July 13 11 9101 8 31...
Страница 144: ...FIGURE 8C FOLDING DIAGRAM STEP 3 July 13 11 8 32 9101...
Страница 146: ...FIGURE 8E FOLDING DIAGRAM STEP 5 Feb 20 13 8 34 9101...
Страница 147: ...FIGURE 8F FOLDING DIAGRAM STEP 6 July 13 11 9101 8 35...
Страница 148: ...FIGURE 8G FOLDING DIAGRAM STEPS 7 8 July 13 11 8 36 9101...
Страница 149: ...FIGURE 9 BURST STRAP ATTACHMENT July 13 11 9101 8 37...
Страница 150: ...FIGURE 10 GASKET REMOVAL July 13 11 8 38 9101...
Страница 151: ...FIGURE 12 ATTACHMENT OF MOORING PAINTERLINES July 13 11 9101 8 39...
Страница 152: ...FIGURE 14 SEALING BAG July 13 11 8 40 9101...
Страница 153: ...FIGURE 15A PLACING BAG IN VALISE July 13 11 9101 8 41...
Страница 154: ...FIGURE 16 INFLATION VAVE PAINTERLINE CONNECTION June 2 08 8 42 9101...
Страница 155: ...FIGURE 18 CONTAINER STRAPS Feb 20 13 9101 8 43 FIGURE 19 HEAT SHRINK SLEEVES...
Страница 156: ...FIGURE 20 TAPE FOR STRAPS AND PAINTERLINE Feb 20 13 8 44 9101...
Страница 157: ...STORAGE June 2 08 9101 9 1 9 General 3...
Страница 158: ...June 2 08 9 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 160: ...June 2 08 9 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 161: ...TOOL EQUIPMENT AND MATERIALS Feb 20 13 9101 10 1 10 General 3 Tool List 5...
Страница 162: ...June 2 08 10 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 164: ...June 2 08 10 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 168: ...Feb 20 13 10 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ...June 2 08 11 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 174: ...June 2 08 11 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 176: ...June 2 08 11 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 182: ...Feb 20 13 11 14 9101...
Страница 186: ...FIGURE 2 CYLINDER VALVE ASSEMBLY June 2 08 11 18 9101...
Страница 188: ...FIGURE 3 INFLATION VALVE ASSEMBLY June 2 08 11 20 9101...
Страница 190: ...FIGURE 4 CONTAINER ASSEMBLY July 13 11 11 22 9101...
Страница 192: ...FIGURE 5 SURVIVAL EQUIPMENT PACK June 2 08 11 24 9101 Please refer to Image List for component visuals...
Страница 204: ...Feb 20 13 11 36 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 205: ...SPARE PARTS LIST Feb 20 13 9101 12 1 12 Introduction 3 Image List 5 Tool Image List 21...
Страница 206: ...Feb 20 13 12 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 208: ...Feb 20 13 12 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 229: ...Feb 20 13 9101 12 25 Description Part Number O Ring Install Kit 95 EOIK34...
Страница 230: ...Feb 20 13 12 26 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 232: ...July 13 11 9101 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 234: ......