
June 2/08
2 - 8
9101
2.
DETAIL
Standard Equipment
The Elite Liferafts are equipped with the following items and features (Figs. 1&2):
1.
Mooring Line
This 20ft. (6.1m) line secures the raft to the vacuum bag, and is used for positioning the inflated
raft for boarding. It has a breaking strength of up to 500lb. (227Kg.)
(IPL Fig. 1, Items 100/110).
2.
Painterline
Pulling on this 50ft. (15.2m) line will activate the inflation system and begin raft deployment. It
secures the vacuum bag to the boat and can also be used as an additional mooring line after
activation. (IPL Fig. 1, Items 120/130).
3.
Knife
A floating raft knife features a sharp blade with a rounded edge to minimize the possibility of
damage to the raft. It is attached with a lanyard for security. The raft knife is used to cut the
painterline attaching the raft to the boat when the decision to cast off has been made.
(IPL Fig. 1, Item 210).
4.
Righting Line
This line is located across the bottom of the raft and is used for turning over (righting) a capsized
raft.
5.
Life Lines/Grasp Lines
Available in the interior and exterior of the raft, these lines provide survivors with a place to grasp
from the water or while seated in the raft. The lifelines are constructed of 1in. (2.5cm) wide
webbing attached by means of fabric patches and strong adhesive.
6.
Reflective Tape
Attached to the canopy, this provides enhanced visibility.
7.
Heaving Line with Quoit
This 75ft. (25m) line is equipped with a heaving ring (quoit). Stowed near the interior grasp line,
the heaving line is thrown or floated to survivors to be pulled into the raft.
(IPL Fig. 1, Item 230).
Содержание 45-AE4V
Страница 2: ......
Страница 4: ...June 2 08 RR 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 6: ......
Страница 8: ...June 2 08 SB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ......
Страница 19: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9101 AP 1 AP None Listed...
Страница 20: ...June 2 08 AP 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...June 2 08 AB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...June 2 08 TC 2 9101 THIS PAGE IN INTENTIONALLY LEFT BLANK...
Страница 26: ...June 2 08 1 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 30: ...June 2 08 2 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 32: ...FIGURE 1 COASTAL AND AERO ELITE Oct 21 16 2 4 9101...
Страница 33: ...FIGURE 2 OFFSHORE ELITE June 2 08 9101 2 5...
Страница 34: ...June 2 08 2 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 39: ...FIGURE 3 VALISE AND CONTAINER June 2 08 9101 2 11...
Страница 40: ...FIGURE 4 INFLATION SYSTEM June 2 08 2 12 9101...
Страница 44: ...July 13 11 2 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 46: ...FIGURE 5 DEPLOYMENT July 13 11 2 18 9101...
Страница 47: ...DISASSEMBLY June 2 08 9101 3 1 3 General 3 Procedures 5...
Страница 48: ...June 2 08 3 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...June 2 08 3 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 54: ...FIGURE 2 REMOVAL FROM CONTAINER VALISE June 2 08 3 8 9101...
Страница 55: ...FIGURE 3 DISCONNECTING THE PAINTERLINE June 2 08 9101 3 9...
Страница 56: ...FIGURE 4 REMOVAL FROM VACUUM BAG July 13 11 3 10 9101...
Страница 57: ...FIGURE 5 UNFOLD RAFT DISENGAGE THE CYLINDER June 2 08 9101 3 11...
Страница 58: ...June 2 08 3 12 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9101...
Страница 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9101...
Страница 66: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9101...
Страница 73: ...FIGURE 1 LEFT CHAMBER INFLATION COASTAL July 13 11 9101 4 15...
Страница 74: ...FIGURE 3 UPPER CHAMBER INFLATION OFFSHORE June 2 08 4 16 9101...
Страница 75: ...FIGURE 5 DIGITAL MANOMETER Feb 20 13 9101 4 17...
Страница 76: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 18 9101...
Страница 81: ...CLEANING June 2 08 9101 5 1 5 General 3 Procedures 5 A Liferafts 5 B Rigid Container 5 C Valise 5...
Страница 82: ...June 2 08 5 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 84: ...June 2 08 5 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 86: ...June 2 08 5 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 88: ...June 2 08 6 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 90: ...June 2 08 6 4 9101 THIS PAGE INITIALLY LEFT BLANK...
Страница 92: ...June 2 08 6 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 94: ...June 2 08 6 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 96: ...June 2 08 6 10 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 98: ...June 2 08 7 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 100: ...June 2 08 7 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9101 7 13...
Страница 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM July 13 11 7 14 9101...
Страница 112: ...June 2 08 7 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 114: ...June 2 08 8 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 116: ...June 2 08 8 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 119: ...FIGURE 2A SEA ANCHOR PREPARATION June 2 08 9101 8 7 FIGURE 2B STOWING PAINTERLINE...
Страница 120: ...FIGURE 3 CONTAINER SPECIFICATIONS June 2 08 8 8 9101...
Страница 122: ...FIGURE 4B 120in TIE LINE CONNECTION July 13 11 8 10 9101...
Страница 140: ...FIGURE 5 TOPPING OFF INFLATE DEFLATE VALVE July 13 11 8 28 9101...
Страница 141: ...FIGURE 7 STOWAGE OF COMPONENTS June 2 08 9101 8 29...
Страница 143: ...FIGURE 8B FOLDING DIAGRAM STEP 2 July 13 11 9101 8 31...
Страница 144: ...FIGURE 8C FOLDING DIAGRAM STEP 3 July 13 11 8 32 9101...
Страница 146: ...FIGURE 8E FOLDING DIAGRAM STEP 5 Feb 20 13 8 34 9101...
Страница 147: ...FIGURE 8F FOLDING DIAGRAM STEP 6 July 13 11 9101 8 35...
Страница 148: ...FIGURE 8G FOLDING DIAGRAM STEPS 7 8 July 13 11 8 36 9101...
Страница 149: ...FIGURE 9 BURST STRAP ATTACHMENT July 13 11 9101 8 37...
Страница 150: ...FIGURE 10 GASKET REMOVAL July 13 11 8 38 9101...
Страница 151: ...FIGURE 12 ATTACHMENT OF MOORING PAINTERLINES July 13 11 9101 8 39...
Страница 152: ...FIGURE 14 SEALING BAG July 13 11 8 40 9101...
Страница 153: ...FIGURE 15A PLACING BAG IN VALISE July 13 11 9101 8 41...
Страница 154: ...FIGURE 16 INFLATION VAVE PAINTERLINE CONNECTION June 2 08 8 42 9101...
Страница 155: ...FIGURE 18 CONTAINER STRAPS Feb 20 13 9101 8 43 FIGURE 19 HEAT SHRINK SLEEVES...
Страница 156: ...FIGURE 20 TAPE FOR STRAPS AND PAINTERLINE Feb 20 13 8 44 9101...
Страница 157: ...STORAGE June 2 08 9101 9 1 9 General 3...
Страница 158: ...June 2 08 9 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 160: ...June 2 08 9 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 161: ...TOOL EQUIPMENT AND MATERIALS Feb 20 13 9101 10 1 10 General 3 Tool List 5...
Страница 162: ...June 2 08 10 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 164: ...June 2 08 10 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 168: ...Feb 20 13 10 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ...June 2 08 11 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 174: ...June 2 08 11 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 176: ...June 2 08 11 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 182: ...Feb 20 13 11 14 9101...
Страница 186: ...FIGURE 2 CYLINDER VALVE ASSEMBLY June 2 08 11 18 9101...
Страница 188: ...FIGURE 3 INFLATION VALVE ASSEMBLY June 2 08 11 20 9101...
Страница 190: ...FIGURE 4 CONTAINER ASSEMBLY July 13 11 11 22 9101...
Страница 192: ...FIGURE 5 SURVIVAL EQUIPMENT PACK June 2 08 11 24 9101 Please refer to Image List for component visuals...
Страница 204: ...Feb 20 13 11 36 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 205: ...SPARE PARTS LIST Feb 20 13 9101 12 1 12 Introduction 3 Image List 5 Tool Image List 21...
Страница 206: ...Feb 20 13 12 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 208: ...Feb 20 13 12 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 229: ...Feb 20 13 9101 12 25 Description Part Number O Ring Install Kit 95 EOIK34...
Страница 230: ...Feb 20 13 12 26 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 232: ...July 13 11 9101 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 234: ......