Oct 21/16
8 - 26
9101
26.
After making sure all vacuum bag corners are contained within the valise, shut the valise by
mating all velcro strips together.
27.
Place completed inspection sticker on valise. (See Section 2 - Description Fig. 3)
Packing into Container
19.
Locate the bottom container shell and place it on the floor of the working area.
20.
Place vacuum packed raft into container with cylinder inflation valve oriented toward the hole in
the side of the container. (See Fig. 15B)
21.
Place painterline sachet assembly lengthwise on top of the vacuum sealed raft with the cord
facing the inflation valve. Tape down with black gaffers tape. (See Fig. 15B)
22.
Measure 1ft. from the exposed portion of the painterline cord closest to the loop patch on the
vacuum bag. Using a screwdriver or another similar object, create a hole in the painterline.
CAREFULLY slip cord over the inflation valve pull cable loop and drag it down until it has cleared
the loop. Bring the end of the cord back through the loop and tie using a bowline knot.
(See Fig. 16)
23.
Tie the end of the same painterline cord to the exterior loop patch on the vacuum bag. Leave
1in.-2in. worth of additional line and tape down with white adhesive tape. Tape should extend
1in. past the extra length of material. (See Fig. 12)
24.
Place the foam plug (IPL Fig. 4, Item 7) into the cut-out hole in the bottom container shell.
Orient so the hole in the foam plug is facing outward and towards the bottom. Pass the end of
the other painterline cord through the hole in the foam plug. (See Fig. 15B)
Note:
Before operating container strap fastening tools, read the operating
instructions in the tool operation and parts list.
Warning: Operator should position themselves to one side of the strap when tensioning.
Maintain proper footing and balance when operation equipment. Do not
operate equipment when you are in an awkward position.
Caution: Use short handle strokes during tensioning. BE CAREFUL – Too much tension
will break the straps.
25.
After the raft and vacuum bag are enclosed in the bottom container shell, place the top container
shell over the bottom shell being sure to align the cutout hole with the grooves in the foam plug.
Содержание 45-AE4V
Страница 2: ......
Страница 4: ...June 2 08 RR 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 6: ......
Страница 8: ...June 2 08 SB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ......
Страница 19: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9101 AP 1 AP None Listed...
Страница 20: ...June 2 08 AP 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...June 2 08 AB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...June 2 08 TC 2 9101 THIS PAGE IN INTENTIONALLY LEFT BLANK...
Страница 26: ...June 2 08 1 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 30: ...June 2 08 2 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 32: ...FIGURE 1 COASTAL AND AERO ELITE Oct 21 16 2 4 9101...
Страница 33: ...FIGURE 2 OFFSHORE ELITE June 2 08 9101 2 5...
Страница 34: ...June 2 08 2 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 39: ...FIGURE 3 VALISE AND CONTAINER June 2 08 9101 2 11...
Страница 40: ...FIGURE 4 INFLATION SYSTEM June 2 08 2 12 9101...
Страница 44: ...July 13 11 2 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 46: ...FIGURE 5 DEPLOYMENT July 13 11 2 18 9101...
Страница 47: ...DISASSEMBLY June 2 08 9101 3 1 3 General 3 Procedures 5...
Страница 48: ...June 2 08 3 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...June 2 08 3 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 54: ...FIGURE 2 REMOVAL FROM CONTAINER VALISE June 2 08 3 8 9101...
Страница 55: ...FIGURE 3 DISCONNECTING THE PAINTERLINE June 2 08 9101 3 9...
Страница 56: ...FIGURE 4 REMOVAL FROM VACUUM BAG July 13 11 3 10 9101...
Страница 57: ...FIGURE 5 UNFOLD RAFT DISENGAGE THE CYLINDER June 2 08 9101 3 11...
Страница 58: ...June 2 08 3 12 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9101...
Страница 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9101...
Страница 66: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9101...
Страница 73: ...FIGURE 1 LEFT CHAMBER INFLATION COASTAL July 13 11 9101 4 15...
Страница 74: ...FIGURE 3 UPPER CHAMBER INFLATION OFFSHORE June 2 08 4 16 9101...
Страница 75: ...FIGURE 5 DIGITAL MANOMETER Feb 20 13 9101 4 17...
Страница 76: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 18 9101...
Страница 81: ...CLEANING June 2 08 9101 5 1 5 General 3 Procedures 5 A Liferafts 5 B Rigid Container 5 C Valise 5...
Страница 82: ...June 2 08 5 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 84: ...June 2 08 5 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 86: ...June 2 08 5 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 88: ...June 2 08 6 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 90: ...June 2 08 6 4 9101 THIS PAGE INITIALLY LEFT BLANK...
Страница 92: ...June 2 08 6 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 94: ...June 2 08 6 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 96: ...June 2 08 6 10 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 98: ...June 2 08 7 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 100: ...June 2 08 7 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9101 7 13...
Страница 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM July 13 11 7 14 9101...
Страница 112: ...June 2 08 7 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 114: ...June 2 08 8 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 116: ...June 2 08 8 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 119: ...FIGURE 2A SEA ANCHOR PREPARATION June 2 08 9101 8 7 FIGURE 2B STOWING PAINTERLINE...
Страница 120: ...FIGURE 3 CONTAINER SPECIFICATIONS June 2 08 8 8 9101...
Страница 122: ...FIGURE 4B 120in TIE LINE CONNECTION July 13 11 8 10 9101...
Страница 140: ...FIGURE 5 TOPPING OFF INFLATE DEFLATE VALVE July 13 11 8 28 9101...
Страница 141: ...FIGURE 7 STOWAGE OF COMPONENTS June 2 08 9101 8 29...
Страница 143: ...FIGURE 8B FOLDING DIAGRAM STEP 2 July 13 11 9101 8 31...
Страница 144: ...FIGURE 8C FOLDING DIAGRAM STEP 3 July 13 11 8 32 9101...
Страница 146: ...FIGURE 8E FOLDING DIAGRAM STEP 5 Feb 20 13 8 34 9101...
Страница 147: ...FIGURE 8F FOLDING DIAGRAM STEP 6 July 13 11 9101 8 35...
Страница 148: ...FIGURE 8G FOLDING DIAGRAM STEPS 7 8 July 13 11 8 36 9101...
Страница 149: ...FIGURE 9 BURST STRAP ATTACHMENT July 13 11 9101 8 37...
Страница 150: ...FIGURE 10 GASKET REMOVAL July 13 11 8 38 9101...
Страница 151: ...FIGURE 12 ATTACHMENT OF MOORING PAINTERLINES July 13 11 9101 8 39...
Страница 152: ...FIGURE 14 SEALING BAG July 13 11 8 40 9101...
Страница 153: ...FIGURE 15A PLACING BAG IN VALISE July 13 11 9101 8 41...
Страница 154: ...FIGURE 16 INFLATION VAVE PAINTERLINE CONNECTION June 2 08 8 42 9101...
Страница 155: ...FIGURE 18 CONTAINER STRAPS Feb 20 13 9101 8 43 FIGURE 19 HEAT SHRINK SLEEVES...
Страница 156: ...FIGURE 20 TAPE FOR STRAPS AND PAINTERLINE Feb 20 13 8 44 9101...
Страница 157: ...STORAGE June 2 08 9101 9 1 9 General 3...
Страница 158: ...June 2 08 9 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 160: ...June 2 08 9 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 161: ...TOOL EQUIPMENT AND MATERIALS Feb 20 13 9101 10 1 10 General 3 Tool List 5...
Страница 162: ...June 2 08 10 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 164: ...June 2 08 10 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 168: ...Feb 20 13 10 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ...June 2 08 11 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 174: ...June 2 08 11 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 176: ...June 2 08 11 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 182: ...Feb 20 13 11 14 9101...
Страница 186: ...FIGURE 2 CYLINDER VALVE ASSEMBLY June 2 08 11 18 9101...
Страница 188: ...FIGURE 3 INFLATION VALVE ASSEMBLY June 2 08 11 20 9101...
Страница 190: ...FIGURE 4 CONTAINER ASSEMBLY July 13 11 11 22 9101...
Страница 192: ...FIGURE 5 SURVIVAL EQUIPMENT PACK June 2 08 11 24 9101 Please refer to Image List for component visuals...
Страница 204: ...Feb 20 13 11 36 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 205: ...SPARE PARTS LIST Feb 20 13 9101 12 1 12 Introduction 3 Image List 5 Tool Image List 21...
Страница 206: ...Feb 20 13 12 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 208: ...Feb 20 13 12 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 229: ...Feb 20 13 9101 12 25 Description Part Number O Ring Install Kit 95 EOIK34...
Страница 230: ...Feb 20 13 12 26 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 232: ...July 13 11 9101 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 234: ......