June 2/08
9101
7 - 7
3.
APPLYING ADHESIVE
A.
Combine the adhesive with the appropriate amount of accelerator and mix until uniform.
The catalyzed system has a pot life of 8 hours.
B.
Both the tube fabric surface and the patch fabric, shall have three (3) coats of adhesive
applied with a stiff brush in such a manner that the adhesive is driven firmly into the fabric
weave.
C.
Apply three (3) liberal coats of adhesive to the surface to be bonded allowing 5-10 minutes
drying time between coats. This will ensure a good basis for each successive coat, ensure a
good adhesive bond and prevent the seepage of air through the fabric.
D.
For the purposes of repair the words ‘tacky’ and aggressive tack are defined as follows:
(1).
When the word ‘tacky’ is used, it means that if the fingers are lightly dragged across
the adhesive, it tends to pull off the base fabric or the previous coat.
(2).
When the words ‘aggressive tack’ are used, they mean that when applying light
pressure to the adhesive, it has bonded to the previous coats and tends to retain, or
stick to, the fingers.
E.
Apply three (3) coats of adhesive to each mating surface, allowing the previous coats to
completely dry before applying the additional coats.
F.
Fifteen minutes after the application of the third coat, when it has developed an aggressive
tack, swab one surface of the adhesive film with MEK.
G.
Allow the excess solvent to “flash off” until tack (Approximately 15-30 seconds).
H.
Join the surfaces and apply pressure with a hand roller. The tack, or open time, will depend
upon the thickness of the dry film and the quantity of solvent applied to the film for
reactivation. In any case, the tack time is very short and the bond must be made when
aggressively tacky.
I.
If the third coat has dried it may be reactivated with a cloth dampened with MEK solvent.
Apply just enough solvent to recreate an aggressive tack on the surface. Reactivation may
be carried out up to two (2) hours after the application of the last coat of solution.
Note:
If the solution becomes too dry between coats, or if any air bubbles are
not completely rolled out, or if the mating surfaces are dry, a ‘dry joint’
will result. The joint will appear sound, but it can be quite easily pulled
apart. When testing with a finger, the solution must show aggressive
tack, but no pick-up of solution. Rolling must be firm, working from the
center of the area toward the edges, expelling the air.
Содержание 45-AE4V
Страница 2: ......
Страница 4: ...June 2 08 RR 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 6: ......
Страница 8: ...June 2 08 SB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ......
Страница 19: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9101 AP 1 AP None Listed...
Страница 20: ...June 2 08 AP 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...June 2 08 AB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...June 2 08 TC 2 9101 THIS PAGE IN INTENTIONALLY LEFT BLANK...
Страница 26: ...June 2 08 1 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 30: ...June 2 08 2 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 32: ...FIGURE 1 COASTAL AND AERO ELITE Oct 21 16 2 4 9101...
Страница 33: ...FIGURE 2 OFFSHORE ELITE June 2 08 9101 2 5...
Страница 34: ...June 2 08 2 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 39: ...FIGURE 3 VALISE AND CONTAINER June 2 08 9101 2 11...
Страница 40: ...FIGURE 4 INFLATION SYSTEM June 2 08 2 12 9101...
Страница 44: ...July 13 11 2 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 46: ...FIGURE 5 DEPLOYMENT July 13 11 2 18 9101...
Страница 47: ...DISASSEMBLY June 2 08 9101 3 1 3 General 3 Procedures 5...
Страница 48: ...June 2 08 3 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...June 2 08 3 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 54: ...FIGURE 2 REMOVAL FROM CONTAINER VALISE June 2 08 3 8 9101...
Страница 55: ...FIGURE 3 DISCONNECTING THE PAINTERLINE June 2 08 9101 3 9...
Страница 56: ...FIGURE 4 REMOVAL FROM VACUUM BAG July 13 11 3 10 9101...
Страница 57: ...FIGURE 5 UNFOLD RAFT DISENGAGE THE CYLINDER June 2 08 9101 3 11...
Страница 58: ...June 2 08 3 12 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9101...
Страница 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9101...
Страница 66: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9101...
Страница 73: ...FIGURE 1 LEFT CHAMBER INFLATION COASTAL July 13 11 9101 4 15...
Страница 74: ...FIGURE 3 UPPER CHAMBER INFLATION OFFSHORE June 2 08 4 16 9101...
Страница 75: ...FIGURE 5 DIGITAL MANOMETER Feb 20 13 9101 4 17...
Страница 76: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 18 9101...
Страница 81: ...CLEANING June 2 08 9101 5 1 5 General 3 Procedures 5 A Liferafts 5 B Rigid Container 5 C Valise 5...
Страница 82: ...June 2 08 5 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 84: ...June 2 08 5 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 86: ...June 2 08 5 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 88: ...June 2 08 6 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 90: ...June 2 08 6 4 9101 THIS PAGE INITIALLY LEFT BLANK...
Страница 92: ...June 2 08 6 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 94: ...June 2 08 6 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 96: ...June 2 08 6 10 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 98: ...June 2 08 7 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 100: ...June 2 08 7 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9101 7 13...
Страница 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM July 13 11 7 14 9101...
Страница 112: ...June 2 08 7 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 114: ...June 2 08 8 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 116: ...June 2 08 8 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 119: ...FIGURE 2A SEA ANCHOR PREPARATION June 2 08 9101 8 7 FIGURE 2B STOWING PAINTERLINE...
Страница 120: ...FIGURE 3 CONTAINER SPECIFICATIONS June 2 08 8 8 9101...
Страница 122: ...FIGURE 4B 120in TIE LINE CONNECTION July 13 11 8 10 9101...
Страница 140: ...FIGURE 5 TOPPING OFF INFLATE DEFLATE VALVE July 13 11 8 28 9101...
Страница 141: ...FIGURE 7 STOWAGE OF COMPONENTS June 2 08 9101 8 29...
Страница 143: ...FIGURE 8B FOLDING DIAGRAM STEP 2 July 13 11 9101 8 31...
Страница 144: ...FIGURE 8C FOLDING DIAGRAM STEP 3 July 13 11 8 32 9101...
Страница 146: ...FIGURE 8E FOLDING DIAGRAM STEP 5 Feb 20 13 8 34 9101...
Страница 147: ...FIGURE 8F FOLDING DIAGRAM STEP 6 July 13 11 9101 8 35...
Страница 148: ...FIGURE 8G FOLDING DIAGRAM STEPS 7 8 July 13 11 8 36 9101...
Страница 149: ...FIGURE 9 BURST STRAP ATTACHMENT July 13 11 9101 8 37...
Страница 150: ...FIGURE 10 GASKET REMOVAL July 13 11 8 38 9101...
Страница 151: ...FIGURE 12 ATTACHMENT OF MOORING PAINTERLINES July 13 11 9101 8 39...
Страница 152: ...FIGURE 14 SEALING BAG July 13 11 8 40 9101...
Страница 153: ...FIGURE 15A PLACING BAG IN VALISE July 13 11 9101 8 41...
Страница 154: ...FIGURE 16 INFLATION VAVE PAINTERLINE CONNECTION June 2 08 8 42 9101...
Страница 155: ...FIGURE 18 CONTAINER STRAPS Feb 20 13 9101 8 43 FIGURE 19 HEAT SHRINK SLEEVES...
Страница 156: ...FIGURE 20 TAPE FOR STRAPS AND PAINTERLINE Feb 20 13 8 44 9101...
Страница 157: ...STORAGE June 2 08 9101 9 1 9 General 3...
Страница 158: ...June 2 08 9 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 160: ...June 2 08 9 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 161: ...TOOL EQUIPMENT AND MATERIALS Feb 20 13 9101 10 1 10 General 3 Tool List 5...
Страница 162: ...June 2 08 10 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 164: ...June 2 08 10 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 168: ...Feb 20 13 10 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ...June 2 08 11 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 174: ...June 2 08 11 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 176: ...June 2 08 11 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 182: ...Feb 20 13 11 14 9101...
Страница 186: ...FIGURE 2 CYLINDER VALVE ASSEMBLY June 2 08 11 18 9101...
Страница 188: ...FIGURE 3 INFLATION VALVE ASSEMBLY June 2 08 11 20 9101...
Страница 190: ...FIGURE 4 CONTAINER ASSEMBLY July 13 11 11 22 9101...
Страница 192: ...FIGURE 5 SURVIVAL EQUIPMENT PACK June 2 08 11 24 9101 Please refer to Image List for component visuals...
Страница 204: ...Feb 20 13 11 36 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 205: ...SPARE PARTS LIST Feb 20 13 9101 12 1 12 Introduction 3 Image List 5 Tool Image List 21...
Страница 206: ...Feb 20 13 12 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 208: ...Feb 20 13 12 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 229: ...Feb 20 13 9101 12 25 Description Part Number O Ring Install Kit 95 EOIK34...
Страница 230: ...Feb 20 13 12 26 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 232: ...July 13 11 9101 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 234: ......