Operating the device
43
6.7.2 Feeding sample material automatically using the DR 100 feed unit
Feed the sample material automatically using the DR 100 feed unit as follows:
Fig. 27:
Device with additional equipment
1. Install the DR 100 feed unit (33) and the
cyclone separator (29) at the device (see
"Installation of additional equipment").
2. Set the operating mode selector switch to
"Standard".
3. Switch on both devices, the ZM 300 and
DR 100 (33).
4. Wait for synchronisation between the
device and the DR 100 feed unit (33).
➔
On the touch display (6), the functions "DR
100 conveying speed" and "Automatic
stop" are activated.
➔
On the display (35) of the DR 100 feed unit
(33), "pc" is displayed.
Fig. 28:
Device with DR 100 feed unit
5. Loosen the toggle screw (38) of the base
plate and swivel away the DR 100 feed unit
(33).
6. Open the device hood (2).
7. Insert the grinding tools and cassette into
the interior (10).
8. Close and lock the device hood (2).
9. Swivel back the DR 100 feed unit (33) and
tighten the toggle screw (38) (
10. Set the parameters for grinding on the
touch display (6) with the control dial (7).
11. Loosen the toggle screw (34) on the
hopper and lower the hopper (32) onto the
chute (28). Fill in the sample material and
afterwards, lift the hopper (32) off the chute
(28) to operating height. The gap should be
three times larger than the largest feed
material to prevent blockage.
29
33
35
6
28
6
7
34
32
38
2
Содержание ZM 300
Страница 2: ...2 Copyright Copyright by Retsch GmbH Retsch Allee 1 5 42781 Haan Germany...
Страница 5: ...Notes on the manual 5...
Страница 92: ......
Страница 93: ...Copyright Copyright by Retsch GmbH Retsch Allee 1 5 42781 Haan Germany...