Safety
11
2.3.3 Workstation and device
•
Ensure the workstation has sufficient lighting and ventilation.
•
Ensure that exhaust air is correctly transported outside.
•
All signs on the device must be maintained in a legible state.
•
Ensure that all checks and maintenance work prescribed in this Manual are carried out.
2.3.4 Qualification of personnel
Work/operating phase
Qualification
•
Transport
•
Installation
•
Putting into service
•
Operation
•
Control
•
Installing additional equipment
•
Maintenance
•
Disposal
•
Qualified professionals who have
been instructed in the safe
handling of the device.
•
Work on the electrical equipment
on the device
•
Qualified electricians who, on the
basis of their technical training,
knowledge and experience, are
able to evaluate the work
assigned to them and identify
potential risks.
2.3.5 Personal protective equipment (PPE)
Work/operating phase
Personal protective equipment (PPE)
•
Transport
•
Installation
•
Safety shoes
•
Putting into service
•
Installing additional equipment
•
Maintenance
•
No PPE required
•
Disposal
•
Safety shoes
•
Normal operation (operation and
control)
•
Protective goggles and hearing
protection when operating the
device without sound protection
funnel
•
Possibly protective gloves for
removing sample material at
extreme temperatures.
Содержание ZM 300
Страница 2: ...2 Copyright Copyright by Retsch GmbH Retsch Allee 1 5 42781 Haan Germany...
Страница 5: ...Notes on the manual 5...
Страница 92: ......
Страница 93: ...Copyright Copyright by Retsch GmbH Retsch Allee 1 5 42781 Haan Germany...