Operating the Device
49
Fig. 32:
Opening the grinding jar for emptying
Component
H
Device hood
SR
Locking wheel
MH
Grinding jar support
ÖH
Opening aid
MB
Grinding jar
SP
Clamping screws
MD
Grinding jar cover
MR
Grinding chamber
Remove the sample material as follows:
Wait for the end of the grinding process.
Open the device hood (H).
Open the locking wheel (SR) on the grinding jar support (MH) by hand or using the
appropriate side of the Opening aid (ÖH) if necessary.
Remove the grinding jar (MB) by pulling it up and out of the grinding jar support (MH).
MD
SR
MR
Содержание Mixer Mill MM 500 nano
Страница 2: ...2 Copyright Copyright by Retsch GmbH Retsch Allee 1 5 42781 Haan Germany...
Страница 5: ...5 10 1 Returning for repair and maintenance 85 11 Accessories 87 12 Disposal 88 13 Index 90...
Страница 6: ...Notes on the manual 6...
Страница 74: ...Device control 74 Fig 51 System settings Page 2 Fig 52 System settings Page 3 SE4 SE5 SE9 SE8 SE6 SE10 SE7...
Страница 76: ...Device control 76 Image 53 MyRetsch QR code to access the web portal Image 54 QR code...
Страница 89: ...Disposal 89...
Страница 94: ......
Страница 95: ...Copyright Copyright by Retsch GmbH Retsch Allee 1 5 42781 Haan Germany...