
UM-B-041
SmartBond Production Line Tool
User Manual
Revision 4.8
02-Nov-2022
CFR0012
161 of 170
© 2022 Renesas Electronics
No.
Status
Description
108.
DUT_PDLL_PKT_RX_STATS_STOP_START
RF RX packet test with statistics stop.
109.
DUT_PDLL_PKT_RX_STATS_STOPPED_OK
RF RX packet test with statistics stopped successfully.
110.
DUT_PDLL_PKT_RX_STATS_STOP_FAILED
RF RX packet test with statistics stop failed.
Production test
– RX sensitivity test
111.
DUT_BLE_TESTER_RX_TEST_PASSED
Bluetooth® LE tester RX sensitivity test passed.
112.
DUT_BLE_TESTER_RX_TEST_FAILED
Bluetooth® LE tester RX sensitivity test failed.
Production test
– HCI error
113.
DUT_PDLL_HCI_STANDARD_ERROR
An error occurred in HCI commands.
Production test - Golden Unit RSSI
114.
DUT_PDLL_GU_RF_RX_TEST_PASSED
Golden Unit RF RX packet test passed.
115.
DUT_PDLL_GU_RF_RX_TEST_FAILED
Golden Unit RF RX packet test failed.
Production test - GPIO/LED test
116.
DUT_PDLL_GPIO_TOGGLE_INIT
GPIO-LED test operation initialized.
117.
DUT_PDLL_GPIO_TOGGLE_START
GPIO-LED test operation start.
118.
DUT_PDLL_GPIO_TOGGLE_FINISHED_OK
GPIO-LED test operation completed successfully.
119.
DUT_PDLL_GPIO_TOGGLE_ERROR
GPIO-LED test operation error.
120.
DUT_PDLL_GPIO_TOGGLE_FAILED
GPIO-LED test operation failed.
121.
DUT_PDLL_GPIO_TOGGLE_PASSED
GPIO-LED test operation passed.
Production test
– GPIO connection test
122.
DUT_PDLL_GPIO_CONNECTION_INIT
GPIO connection test operation initialized.
123.
DUT_PDLL_GPIO_SET_START
GPIO connection test set operation start.
124.
DUT_PDLL_GPIO_SET_ERROR
GPIO connection test set operation error.
125.
DUT_PDLL_GPIO_SET_FINISHED_OK
GPIO connection test set operation success.
126.
DUT_PDLL_GPIO_GET_START
GPIO connection test get operation start.
127.
DUT_PDLL_GPIO_GET_ERROR
GPIO connection test get operation passed.
128.
DUT_PDLL_GPIO_GET_FINISHED_OK
GPIO connection test get operation success.
129.
DUT_PDLL_GPIO_CONNECTION_ERROR
GPIO connection test operation error.
130.
DUT_PDLL_GPIO_CONNECTION_FAILED
GPIO connection test operation failed.
131.
DUT_PDLL_GPIO_CONNECTION_PASSED
GPIO connection test operation completed successfully.
Production test - Sensor test
132.
DUT_PDLL_SENSOR_TEST_INIT
Sensor test action initialized.
133.
DUT_PDLL_SENSOR_TEST_START
Sensor test action start.
134.
DUT_PDLL_SENSOR_TEST_OK
Sensor test action ended successfully.
135.
DUT_PDLL_SENSOR_TEST_FAILED
Sensor test action failed.
136.
DUT_PDLL_SENSOR_TEST_DATA_MATCH_OK
Sensor test action data matched.