
UM-B-041
SmartBond Production Line Tool
User Manual
Revision 4.8
02-Nov-2022
CFR0012
111 of 170
© 2022 Renesas Electronics
Step
Description
5
General
Statistics
Click Reset, then Save.
Test Options
Enable all options then Save.
Production tests should be enabled for the XTAL
Trim and the RF tests to run.
Memory programming is required for the QSPI
erase and check empty functions.
Disable the rest of the options.
6
DUT Hardware Setup
UART Baud Rate
1000000
7
Test Settings
XTAL Trim
Check
Enable
in XTAL Trim. Select the same pin
as the
UART Rx
,
RF Tests -
Golden Unit
Only one test is enabled for this example.
In Golden Unit:
●
Check
Enable
●
Select 2424
MHz as
frequency
●
Set the
RSSI
limit
to -70 dBm
●
Set
Packet error limit
to 10%