Positioning of the appliance ..................................19
Ventilation .............................................................20
Main dimensions ...................................................21
Positioning the appliance ..................................25
Positioning the boiler on its own ............................25
Fitting the boiler to a DHW tank ............................27
Positioning the boiler to the left or right of a DHW
tank .......................................................................28
Hydraulic connections .......................................28
Flushing the system ..............................................28
Hydraulic connection of the heating circuit ............29
Connection of the water circuit for domestic
use ........................................................................29
Connecting the expansion vessel .........................29
Connecting the condensate discharge pipe ..........30
Filling the condensate trap ....................................31
Gas connection ...................................................31
Flue gas system connections ............................32
Classification .........................................................32
Lengths of the air/flue gas pipes ...........................33
Electrical connections ........................................35
Control unit ............................................................35
Recommendations ................................................35
Access to the connection terminal ........................36
Position of the PCBs .............................................38
Heating circuit with boiler alone ............................38
Connecting a direct heating circuit and a domestic hot
water tank ..............................................................39
Optional electrical connections ........................42
Position of the optional PCBs ................................42
Position of the connections on the PCU
board .....................................................................43
c-Mix PCB .............................................................43
0-10 V (IF-01) PCB ...............................................44
Connection possibilities for the PCB (SCU-
S02) .......................................................................46
Connection possibilities for the PCB (SCU-
S03) .......................................................................49
Connection possibilities for the PCB (SCU-
X01) .......................................................................50
5.10 Electrical diagram ...............................................52
5.11 Filling the system ...............................................53
Water treatment ....................................................53
Filling the system ..................................................53
Control panel .......................................................55
Functions of the keys ............................................55
Contents
22/04/2016 - 300026141-001-07
2
Содержание CALORA TOWER GAS 15S EX
Страница 7: ...22 04 2016 300026141 001 07 5...
Страница 101: ...en Appendix Information on the ecodesign and energy labelling directives...
Страница 105: ...1 Specific information 300026141 ErP02 03052016 5...
Страница 106: ...1 Specific information 6 300026141 ErP02 03052016...
Страница 107: ......