Meaning of the symbols on the display .................55
Check points before commissioning ................56
Preparing the boiler for commissioning .................56
Gas circuit .............................................................56
Hydraulic circuit .....................................................58
Electrical connections ...........................................58
Putting the appliance into operation ................58
Gas settings ........................................................60
Adapting to another gas type ................................60
Checking and setting combustion .........................60
Basic setting for the gas/air ratio ...........................64
Checks and adjustments after
commissioning ...................................................64
Finalizing work ......................................................64
Reading out measured values ...........................65
Reading out measured values ..............................65
Readout from the hour counter and percentage of
successful starts ....................................................67
Status and sub-status ...........................................67
Changing the settings ........................................68
Parameter descriptions .........................................68
Modification of the installer-level parameters ........73
Setting the maximum heat input for central heating
operation ...............................................................73
Return to the factory settings Reset Param ..........74
Carrying out an auto-detect ...................................75
Switching off the appliance .....................................................................76
Installation shutdown .........................................76
Antifreeze protection ..........................................76
Checking and maintenance .....................................................................77
Resetting the automatic maintenance
message ................................................................77
Dealing with the next maintenance message and
starting the new maintenance period ....................78
Checking the hydraulic pressure ...........................78
Checking the expansion vessel .............................79
Checking the ionization current .............................79
Checking the tightness of the flue gas evacuation and
air inlet connections ..............................................79
Checking combustion ............................................79
22/04/2016 - 300026141-001-07
3
Содержание CALORA TOWER GAS 15S EX
Страница 7: ...22 04 2016 300026141 001 07 5...
Страница 101: ...en Appendix Information on the ecodesign and energy labelling directives...
Страница 105: ...1 Specific information 300026141 ErP02 03052016 5...
Страница 106: ...1 Specific information 6 300026141 ErP02 03052016...
Страница 107: ......