n
Pressure switch minimum Gps
The minimum gas pressure switch shuts the boiler down if the inlet
gas pressure becomes too low. Connect the minimum gas pressure
switch to the
Gps
terminals of the connector. The presence of the gas
pressure switch must be set using parameter
p41
.
n
Heat Recovery Unit (Hru)
Connect the wires from the heat recovery unit to the
Hru
terminals of
the connector. The presence of the heat recovery unit must be set
using parameter
p4"
.
5.9.7.
Connection possibilities for the PCB (SCU-
X01)
n
Installing the PCB
SCU-X01
C003822-A
SCU-X01
PCU 192
SCU-S
n
Connecting the board
Connect the BUS connector on the SCU-X01 board to the PCU board
in the boiler.
5. Installation
CALORA TOWER GAS 15S EX CALORA TOWER GAS 25S EX
CALORA TOWER GAS 35S EX
50
22/04/2016 - 300026141-001-07
Содержание CALORA TOWER GAS 15S EX
Страница 7: ...22 04 2016 300026141 001 07 5...
Страница 101: ...en Appendix Information on the ecodesign and energy labelling directives...
Страница 105: ...1 Specific information 300026141 ErP02 03052016 5...
Страница 106: ...1 Specific information 6 300026141 ErP02 03052016...
Страница 107: ......