Greenfire® GF1500L-2 Gas Fireplace
| 19
installation
Optional Framing Kit
920-194
01/28/20
OPTIONAL FRAMING KIT
1
.
Construct the timber framing, ensure inside dimensions are 1095 mm H
x 1394 mm W as shown below.
NN
NN
2. Bend both side nailing strips from the side of the appliance until
positioned as shown below. Determine the overall combined thickness
of the non-combustible board + finished material being used. The
nailing strips can be adjusted up to 38mm. Remove top nailing strip and
recycle.
3. Adjust the nailing strips by loosening 2 screws on each nailing strip -
adjust and retighten screws.
NOTE:
depending on the finishing material used.
4. Attach both vertical studs (607-065) to the vertical timber studs and
secure using 6 screws, as shown.
NOTE
: Ensure the flat side of the steel stud is facing the timber framing.
(607-065)
Flat side out
5. Secure horizontal steel header stud
(606-067)
with 2 screws per side as
per diagram.
6. Slide the unit into position. Hook up gas, flueing, electrical and
conversion kit (if purchased) prior to installing the remaining steel studs.
7. Secure the upper horizontal steel stud
(606-067)
as shown with 2
screws per side.
8. Secure the top large horizontal stud
(607-027)
with 2 screws per side
as shown. Bring finishing material to the edge of the top framing lip on
large stud
(607-027).
9. Install the large lower stud
(607-066)
with 2 screws on each side.
Header stud
(606-067)
606-067
607-065
607-027
607-066
607-065
Nailing Strips
Remove Top
Nailing Strip
Large stud
(607-027)
Large stud
(607-066)
Horizontal stud
(606-067)
tooltip
Framing Lip
Finishing with
non combustible
material
Use Top Holes
Finishing with
combustible material
Use lower holes
1
GF1500L-1
Содержание Greenfire GF1500L
Страница 74: ...74 Greenfire GF1500L 2 Gas Fireplace notes ...
Страница 75: ...Greenfire GF1500L 2 Gas Fireplace 75 notes ...