City Series CST60E
|
5
table of contents
Vertical Terminations - 5" x 8" - Rigid or Flex Pipe ........................... 56
Vertical Terminations - Vertical Flex Vent Kit (Part #946-772) ............ 57
Vertical Flue Extension Kit (Part # 946-769)...................................... 59
Ceiling Firestop / Firestop Spacer (Part # 946-770) .......................... 60
Wiring Diagram - Non Power Vent ..................................................... 61
Wiring the Unit (120 Volt Power Supply) ............................................ 62
Venting Introduction - Power Vent ...................................................... 64
4"x 6-5/8" (102 mmx 168 mm) Rigid Pipe Cross Reference Chart .... 65
Horizontal Terminations - Inline Horizontal Vent Chart ...................... 67
Vent Restrictor Position ..................................................................... 67
Horizontal Terminations - End of Line Horizontal Vent Chart ............. 68
Vent Restrictor Position ..................................................................... 68
Horizontal Terminations - Inline Power Vent - 4" x 6-5/8" Flex Vent ... 69
Horizontal Terminations - Inline Power Vent - 4" x 6-5/8" Rigid Pipe . 70
Horizontal Terminations - End of Line Power Vent - Rigid Pipe 4" x 6-5/8"
(102 mm x 168 mm) .......................................................................... 71
Power Vent Installation - End of Line Power Vent - Flex Pipe ............ 72
Horizontal Termination - 4" x 6-5/8" (102 mm x 168 mm) Venting (Rigid
Vent Systems) ................................................................................... 73
Venting Arrangement for Vertical Terminations-Inline Power Vent .... 74
Vertical Inline Power Vent Terminations - Rigid Pipe ......................... 75
Vertical Terminations - Rigid Pipe 4" x 6-5/8" (102 mm x 168 mm) ... 76
Vertical Terminations - Flex Pipe ....................................................... 77
Inline Power Vent Dimensions ........................................................... 78
Gas Power Vent Installation - Framing- Inline Power Vent Terminations 79
Power Vent Terminal Installation-Inline Power Vent Terminations ...... 80
Gas Power Vent Installation Clearance Requirements - Inline Power Vent
Terminations ...................................................................................... 81
Horizontal Termination-End of Line Power Vent - 4" x 6-5/8" (102 mm x
168 mm) Rigid Venting ...................................................................... 82
Horizontal Termination-End of Line Power Vent - 4" x 6-5/8" (102 mm x
168 mm) Flex Venting ........................................................................ 83
Vertical Inline Power Vent Terminations - Rigid Pipe ......................... 84
Vertical Inline Power Vent Terminations - Flex Pipe (Part # 946-755) 85
Vertical Inline Power Vent Terminations - Flex Pipe ........................... 86
Vertical Flue Extension Kit - Horizontal Power Vent Kit ..................... 87
Top Vent Reducer Installation - 5" x 8" (127 mm x 203 mm) to 4" x 6-5/8"
(102 mm x 168 mm) (Part # 946-758) ............................................... 88
Ceiling Firestop/Firestop Spacer (Part 946-757) ............................... 88
Gas Power Vent Install - Wiring the Inline Power Vent to the Unit ...... 89
Gas Power Vent Installation - Wiring - End of Line Power Vent ......... 90
Gas Power Vent Installation-Wiring-End of Line Power Vent ............. 91
Gas Power Vent Installation--Wiring the Power Vent to the Unit ........ 92
Wiring Diagram-Power Vent Application ............................................ 94
Inner Glass Panel (Firebox Glass) Installation / Removal ................. 95
Glass Barrier Installation ................................................................... 97
Glass Barrier Adjustment................................................................... 98
Inner Black Steel/Enamel Panel Installation (Part #450-907/450-908) 99
Inner Black Glass Panel Installation ................................................ 101
Clean Trim Faceplate Installation ..................................................... 103
Burner and Firebox Media Options .................................................. 104
Optional Driftwood Log Set Installation ........................................... 106
Maintenance Instructions................................................................. 114
General Vent Maintenance .............................................................. 114
Log Replacement ............................................................................ 114
Glass Gasket ................................................................................... 114
Glass ............................................................................................... 114
Glass Replacement ......................................................................... 114
Flame Pattern .................................................................................. 114
Aeration Adjustment ........................................................................ 115
Copy of Safety Decal ........................................................................... 7
Decal Location ..................................................................................... 7
Important Message ............................................................................ 9
Before You Start ................................................................................... 9
First Fire ............................................................................................ 10
Normal Operating Sounds Of Gas Appliances .................................. 10
Lighting Procedure ............................................................................ 11
Shutdown Procedure ......................................................................... 11
Copy of the Lighting Plate Instructions .............................................. 12
Proflame II Remote Control Operating Instructions ........................... 13
Maintenance Instructions................................................................... 17
General Vent Maintenance ................................................................ 17
Log Replacement .............................................................................. 17
Glass ................................................................................................. 17
Glass Replacement ........................................................................... 17
Replacement Glass Part Numbers .................................................... 17
Dimensions ........................................................................................ 18
Gas Connection - Bottom of Unit ....................................................... 19
Gas/Electrical Connections - Side of Unit.......................................... 19
Gas Connection ................................................................................. 19
Electrical Connection ......................................................................... 19
General Safety Information ................................................................ 20
Installation Checklist .......................................................................... 20
Heatwave Duct System - Optional Kit ............................................... 20
Locating Your Gas Fireplace .............................................................. 21
Unit Assembly Prior to Installation ..................................................... 22
Chase Enclosure ............................................................................... 24
Clearances - Flush Installation .......................................................... 25
Flush Installation Examples (Ventilation Openings) .......................... 26
Clearances - Bench Installation ......................................................... 29
Mantel Clearances ............................................................................. 33
Mantel Leg Clearances ...................................................................... 34
Framing Dimensions .......................................................................... 35
Chase Vent Installation (White Front) (Part # 686-991) ..................... 36
Wall Board/Drywall Installation .......................................................... 37
No Screw Zones ................................................................................ 37
Framing and Finishing Inset Installations .......................................... 38
Finishing ............................................................................................ 41
Wall Mount On / Off Switch and Battery Holder Installation .............. 42
LP Conversion Instructions ................................................................ 43
NG System Data ................................................................................ 45
LP System Data ................................................................................. 45
High Elevation .................................................................................... 45
Gas Line Installation .......................................................................... 45
Pilot Adjustment ................................................................................. 45
Gas Pipe Pressure Testing ................................................................ 45
885 S.I.T. Valve Description ............................................................... 45
Exterior Vent Termination Locations .................................................. 46
5” x 8” (127 mm x 203 mm) Rigid Pipe Cross Reference Chart
(Non Power Vent) ............................................................................. 47
Vent Restrictor Position ..................................................................... 49
Venting Introduction ........................................................................... 50
Venting Arrangement for Horizontal Terminations (Rigid and Flex) ... 50
Horizontal Terminations - Flex Vent 5" x 8" (127 mm x 203 mm) ....... 51
Horizontal Terminations - Rigid Pipe 5" x 8" (127 mm x 203 mm) ..... 52
Horizontal Venting with Two 90
o
Elbows ............................................ 53
Horizontal Venting with Three 90
o
Elbows ......................................... 53
Venting Arrangement for Vertical Terminations - 5" x 8"
(127 mm x 203 mm) Rigid and Flex Pipe ........................................ 54
Vertical Terminations - 5" x 8" (127 mm x 203 mm) Rigid Pipe ........ 55
Installer's information
Installation - General
Installation - Non Power Vent
Installation - Power Vent
Installation - Panels, Barriers, Faceplates
Owner's information
Installation - Media
Maintenance
Содержание City CST60E-LP
Страница 125: ...City Series CST60E 125 notes ...
Страница 130: ...130 City Series CST60E warranty ...
Страница 131: ......