Installation
20 — English
Vacuum spray degassing — 03.11.2014
6.3.1
Hydraulic connection
6.3.1.1
Degassing line to the system
Installation detail of the "DC" degassing line
Install the "DC" degassing lines as shown below:
000171_001_R001
DC
DC
≥ 500
DC
DC
≥ 500
DC
DC
≥ 500
Proceed as follows:
•
Prevent an overload of the "ST" dirt trap in the device caused by coarse dirt.
•
Install the "DC" gas-rich degassing line upstream of the gas-poor degassing line when viewed in system flow direction.
•
Preferably install at the return flow side of the facility system.
– The water temperature must be in the range of 0 °C to 70 °C to ensure sufficient degassing capacity.
Содержание Servitec 30 Mobil
Страница 1: ...Vacuum spray degassing 03 11 2014 Servitec 30 Mobil GB Operating manual Original operating manual...
Страница 2: ......
Страница 51: ......
Страница 53: ......