User Manual
FROG-9
Page61
vii.
Buoyancy columns marked externally with unit number.
Decal - Vinyl Stickers Located Inside of Buoyancy Units
Note: MDPE buoyancy requires preparation of surface for good contact adhesion. Gently heat the contact area until the
surface is oxidised and appears shiny.
Refer to diagram FROG-9 Column Marking Plan for layout:
i.
6 off per FROG-
9: “Ensure belts are properly tightened and adjusted before lift
-of
f” at upper
outer edge of lower buoyancy unit. One at each side of lower buoyancy unit.
ii.
6 off per FROG-
9: “Keep Feet Inside FROG” at upper outer edge of lower buoyancy unit. One
at each side of lower buoyancy unit.
Decal - Operating Instructions - Located Inside of Buoyancy Units
Note: MDPE buoyancy requires preparation of surface for good contact adhesion. Gently heat the contact area until the
surface is oxidised and appears shiny.
Refer to diagram FROG-9 Column Marking Plan for layout:
i.
Operating Instructions.
ii.
Pre-Operational Checks.
iii.
Seating Arrangement.
iv.
SWL Rating.
Positioned as follows:
Column A
Column B
Column C
Operating Instructions
1 x A4 Page
-
-
Pre-Operational Checks
-
1 x A4 Page
-
Seating Arrangement
-
-
1 x A4 Page
SWL Rating
1
-
1
Содержание FROG-9
Страница 1: ...FROG 9 User Manual Rev 05 Issued 05 Mar 10...
Страница 52: ...User Manual FROG 9 Rev 05 Page52 Link to Index...
Страница 53: ...User Manual FROG 9 Rev 05 Page53 Link to Index...
Страница 54: ...User Manual FROG 9 Rev 05 Page54 Link to Index Link to Index...
Страница 55: ...User Manual FROG 9 Rev 05 Page55 Link to Index Link to Index...
Страница 56: ...User Manual FROG 9 Rev 05 Page56...