User Manual
FROG-9
Page28
Table 3: Inspection and Maintenance Recommendations
INSPECTION AND
MAINTENANCE
RECOMMENDATIONS
(ALL RML TRANSFER PRODUCTS)
[Rev01-91030]
RECOMMENDED FREQUENCY
INSPECTIONS
LOAD
TESTS
MAINTENANCE
Pre
Operational
Visual
Check
Visual
Inspection
Examination
Post Load
Test Visual
Inspection
Proof Load
Test
Sling
Replacement
Critical Parts
Replacement
Unit
Replacement
USEAGE CATEGORY
Section 6.4
Section 6.5
Section 6.6
Section 6.7
Section 6.8
Section 6.9
Section 6.10
Section 6.11
Usage
Category
No of
Transfers
per Year
No of
Transfers
per Week
not exceeding
not exceeding
(depending on
Visual Inspection
this period may
be reduced)
not exceeding
not exceeding
not exceeding
not exceeding
Low
<100
<2
before
every use
6 months
12 months
After Load
Test
12 months
12 months
36 months
8 years
Medium
100 to
500
2 to 10
before
every use
6 months
12 months
After Load
Test
12 months
12 months
24 months
7 years
High
500 to
1500
10 to 30
before
every use
3 months
12 months
After Load
Test
12 months
6 months
12 months
6 years
Very
High
1500 to
2500
30 to 50
before
every use
3 months
12 months
After Load
Test
12 months
3 months
whenever
Examination
conducted
4 years
Содержание FROG-9
Страница 1: ...FROG 9 User Manual Rev 05 Issued 05 Mar 10...
Страница 52: ...User Manual FROG 9 Rev 05 Page52 Link to Index...
Страница 53: ...User Manual FROG 9 Rev 05 Page53 Link to Index...
Страница 54: ...User Manual FROG 9 Rev 05 Page54 Link to Index Link to Index...
Страница 55: ...User Manual FROG 9 Rev 05 Page55 Link to Index Link to Index...
Страница 56: ...User Manual FROG 9 Rev 05 Page56...