User Manual
FROG-9
Page38
6.7
Post Load Test Visual Inspection
Question
Response
When should a Post Load
Test Visual Inspection be
conducted?
A post load test visual inspection must be conducted immediately
following every load test.
The load test exerts additional stress into the FROG and this
inspection formally records whether any resulting weakness is
observed.
Who should conduct this
inspection?
A Competent Person.
Does
this
inspection
require a formal record?
Yes.
What
drawings
are
required to support this
inspection?
Drawing No
Revision Description
HC9-CC-A1
E
Load Path Assembly
HC9-SE-A1
C
Seating Assembly
HC9-GA-02
E
Central Column Assembly
The above diagrams are available in
What equipment is
required to perform this
inspection?
i.
A ladder.
ii.
An inspection frame or floor matting.
iii.
Good lighting.
A suitable means of safely accessing the top and the bottom parts of
the FROG-9 is required. When using a step ladder or ladder it should
be securely fixed to prevent slippage whilst accessing the top of the
FROG. The FROG-9 can be laid on its side on protective matting, or
the use of a secure inspection frame assembly to safely access the
underside of the FROG-9 is recommended. Do not go underneath an
active lift.
Be aware that in some regions “Working at Height” regulations may
apply.
The following checklist is suggested as a suitable list of required inspection items and a suitable
format for recording key inspection data. A
‘
WORD
’
and ‘EXCEL’
copy of this inspection checklist is
included on the distributed CD’s and is also available on the Reflex Marine Ltd website at
Содержание FROG-9
Страница 1: ...FROG 9 User Manual Rev 05 Issued 05 Mar 10...
Страница 52: ...User Manual FROG 9 Rev 05 Page52 Link to Index...
Страница 53: ...User Manual FROG 9 Rev 05 Page53 Link to Index...
Страница 54: ...User Manual FROG 9 Rev 05 Page54 Link to Index Link to Index...
Страница 55: ...User Manual FROG 9 Rev 05 Page55 Link to Index Link to Index...
Страница 56: ...User Manual FROG 9 Rev 05 Page56...