background image

10 

 

The  CABKING-6V3  is  designed  as  a  maintenance  free  unit.    There  are  no  belts,  pul-
leys, gears, or other parts to actively maintain.  All parts should be cleaned manually. 

 

Changing  Wheels

—The  diamond  wheels  supplied 

with  the  machine  are  6”  x  1.5”  with  a  1”  arbor.    The 
CabKing works with any style of wheel that is 1” arbor.  

Please    note  that  our  resin  wheels  are  designed  to 
work  exclusively  together  in  sequence

For  best  re-

sults,  you  should  change  all  the  resin  wheels  if  you 
plan on using different brands.  All the wheels will last you a 
long time with proper usage, however they will eventually wear out.  Once this happens 
you will need to twist off either the left shaft assembly (FIG. M) or right shaft assembly 
(FIG. N).  Before removing either assembly make sure to turn off the machine.   

 

Start  by  removing  the  hoods.    Next,  take  the    flange  wrench 
and  use  it  to  secure  the  shiny  metal  flange  located  on  the  in-
side part of the left or right shaft closest to the motor (FIG. U).  
Holding the wrench will prevent the shafts from spinning as you 
take off the wheel assembly.  To take off either wheel assembly 
turn the assembly towards you clockwise for the left assembly, 
counter-clockwise for the right (FIG. O).  

 

The  left  wheel  assembly  can  be  disassembled  by  removing  the  brass 
adapter by twisting it clockwise (FIG V.) with a pair of pliers (not included).  
The  slotted  bolt  on  the  end  is  used  to  attach  optional  1/2”  arbor  laps 
(remove  bolt  by  turning  clockwise).  The  three  spacers  on  this  assembly 
are two 3/4” and one 1”.   

 

The right wheel assembly can be disassembled by unscrewing clockwise 
the washer (FIG V.) on the end with a pair of pliers.  The two aluminum 
spacers on this assembly are 3/4”. 

 

You can slide the wheels off and change as necessary.  Make sure to correctly position 
the  wheels  using  the  spacers.    Correctly  positioned  wheels  should  have  roughly  3/4” 
gap between them.  Also, make sure the grits are in the correct order and the wheels 
are tightly secured.  Reverse the process to put the assemblies back on and make sure 
to re-attach the intake tubes to the T-junction. 

 

PARTS & MAINTENANCE

 

FIG. M 

FIG. N 

FIG. V 

LOOSEN 

LOOSEN 

FIG. O 

Содержание Cabking-6v3

Страница 1: ...INSTRUCTION MANUAL ...

Страница 2: ...the motor or pump with wet hands and avoid touching the pump when connected to the power Wear the enclosed safety goggles to protect from any debris that may fly out while grinding Do not wear loose clothing or clothing that can become entangled with the wheels Some rocks contain poisonous elements such as uranium mercury lead arsenic etc Be certain you are not grinding material that exhib its thi...

Страница 3: ...BLE OF CONTENTS PARTS LIST ASSEMBLY INSTRUCTIONS CONNECTING THE SINGLE PASS WATER SYSTEM FINAL ASSEMBLY MACHINE USAGE THE ART OF CABBING PARTS MAINTENANCE TROUBLESHOOTING WARRANTY INFO 4 5 6 7 8 9 10 14 15 ...

Страница 4: ...SIN WHEEL 1 6 FLANGE KEY 1 20 1200 RESIN WHEEL 1 7 PUMP 1 21 600 RESIN WHEEL 1 8 DRIP TUBE 2 22 BASEBOARD 1 9 INTAKE TUBE 1 23 280 RESIN WHEEL 1 10 DIAMOND PASTE 1 24 220 DIAMOND WHEEL 1 11 APRON 1 25 80 DIAMOND WHEEL 1 12 HOOD SPLASH GUARD 2 26 FULL FACE LAP 360 1 13 WHEEL SPLASH GUARD 2 27 LAP ADAPTER 1 14 HOOD 2 28 BOOK 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 27 23 24 25 22 26 2...

Страница 5: ...d place on the predetermined location We recommend that two people help in performing this step 4 Remove foam packaging material and inspect unit for damage Check to make sure all the parts are present according the parts list on the opposite page If you find any missing or damage parts please contact your dealer immediately 5 Place the clear stone trays on top of the right and left hoods and inse...

Страница 6: ...t behind the motor FIG E Tug on this tubing to verify a secure connection 11 Make sure pump is not connected to power supply Connect the other end of the blue tube to the water pump Tug on this tubing to verify a secure connection Place the pump in a separate large 5gal bucket not included filled fully with clean water FIG F To ensure enough water pressure the length from the bucket to the unit sh...

Страница 7: ...l Avoid touching the pump in the water bucket with the power on NEVER UNPLUG OR TOUCH THE POWER CORDS WITH WET HANDS 15 You can turn the power on the machine The wheels spin at 1800RPM so do not wear loose clothing or anything that may accidentally get entangled with the wheels It is typical for the motor to produce a winding sound when starting up and a mild humming sound after On some occasions ...

Страница 8: ...ess of mak ing a cabochon is described below To make the cabochon start with the hard diamond wheels on the left which will allow you to create a domed shape from your rough stone You can choose to hold your stone free hand or on a dop stick Begin with the 80 grit diamond wheel and be sure to completely grind the surface of the stone using adequate water coolant If the stone is not ground thorough...

Страница 9: ...y twisting and turning the tube as well as the nozzle FIG K This will allow the water to spread over the disc when spinning Make sure to use a separate polishing pad for each different kind of polishing compound Now that you have domed and polished your stone you can put a flat on the backside using the full face diamond flat lap FIG Z Attach the lap by screwing it into the end of the right wheel ...

Страница 10: ...otor FIG U Holding the wrench will prevent the shafts from spinning as you take off the wheel assembly To take off either wheel assembly turn the assembly towards you clockwise for the left assembly counter clockwise for the right FIG O The left wheel assembly can be disassembled by removing the brass adapter by twisting it clockwise FIG V with a pair of pliers not included The slotted bolt on the...

Страница 11: ...ip You want to monitor the water level in the bucket to make sure the pump is always submerged The pump is not designed to run dry so be vigilant All parts of the water system can be disassembled by pulling off or unscrewing then cleaned with soapy water For routine maintenance it is a good idea to clean the noz zles Y SPLIT and tubing with a small wire brush or pipe cleaner like the one supplied ...

Страница 12: ...ke tubes from the T Junction FIG P This can be a little tricky so make sure to push in on the light blue ring before pulling out the tube Then lift up out of the drip pans Make sure to reconnect the intake tube after putting the hoods back on Guards The CABKING 6V3 comes with two clear adjustable splash guards attached to the hoods These splash guards can be tightened using the side knob on the ho...

Страница 13: ...re not to mix and match with other brands of wheels Doing so will most likely result in scratching and improper grinding polishing If you plan on using other types of resin wheels make sure to replace all the wheels Diamond Laps The CABKING 6V3 is configured to accept a standard 1 2 arbor hole lap FIX Y with base to be used on the brass adapter located on the left shaft or a full face lap FIG Z wi...

Страница 14: ...AN NOZZLES AND Y SPLITS WITH PIPE CLEANER OR SMALL BRUSH DRIP PANS DO NOT DRAIN SHAKE THE DRIP PAN TUBING WATER SHOULD BE FLOWING OUT OF THE DRIP PAN TUBES IF NOT THEN SHAKE THE TUBES TO START THE FLOW WHILE TILTING THE PANS UPWARD MAKE SURE CLEAR TUBING ATTACHED TO DRIP PAN IS ANGLED DOWN WARD THE TUBING SHOULD ALSO BE CUT TO LENGTH AFTER SETTING UP THE UNIT CLEAN THE DRIP PAN OUTSPOUT RESIN WHEE...

Страница 15: ...e incorrect usage failure to adequately take care of the machine or improperly following the instructions Who is covered under this warranty The warranty covers the original purchaser of the equipment This warranty is non transferrable What is the warranty period The warranty is in force for one year from the date of purchase Please retain this book for your records What to do if you need warranty...

Страница 16: ...16 ...

Отзывы: