5
Refer to picture above for assembly.
1. Determine a suitable location to place the CABKING-6V3. The CABKING-6V3
weighs about 45lbs. so you will need a sturdy table or stable surface that has ap-
proximately 3 feet width by 2 feet depth of clear space. Try to find a well lit area so
you can clearly see what you are grinding.
2. Open the box and remove all loose foam and accessories. Keep this packaging
aside should you need it in the future.
3. Next remove the unit from the box and place on the predetermined location. We
recommend that two people help in performing this step.
4. Remove foam packaging material and inspect unit for damage. Check to make
sure all the parts are present according the parts list on the opposite page. If you
find any missing or damage parts please contact your dealer immediately.
5. Place the clear stone trays on top of the right and left hoods and insert the hand
rests into the drip pans.
6. Place splash guards on both sides of the drip pans. You can adjust their position
according to the splash.
ASSEMBLY INSTRUCTIONS
FIG. A
SPOT LIGHT
SPLASH GUARDS
DRIP PAN
ON/OFF SWITCH
HAND REST
SIDE PANEL
STONE TRAY
WATER FLOW
CONTROL KNOBS
Содержание Cabking-6v3
Страница 1: ...INSTRUCTION MANUAL ...
Страница 16: ...16 ...