![Real Flame Element 1200 MARK 2 Скачать руководство пользователя страница 95](http://html1.mh-extra.com/html/real-flame/element-1200-mark-2/element-1200-mark-2_installation-and-operation-manual_1425081095.webp)
95
Page
Fit flue clamp over flue
(loosely).
Slide flue onto connection
spigot fully.
Tighten clamp fully.
Wipe excess silicon,
visually check connection
to ensure connection is
fully sealed.
Apply soapy water
to ring in Poly Pro flue
and dampen surface of
connector.
Push connector fully into
Poly pro end connection.
Push both clips over to lock
into place.
Lubricate the Poly pro with
water or soapy water.
Slide the poly onto the
joiner connection.
Run Poly to wall mount fan.
Содержание Element 1200 MARK 2
Страница 6: ...6 Page OPERATION INSTRUCTIONS ...
Страница 20: ...20 Page IN STALL ATION INSTRUCTIONS ...
Страница 26: ...26 Page 0 5M FLUE CONFIGURATION ...
Страница 30: ...30 Page Flue runs 0m to 5m length rooftop termination with external motor ...
Страница 34: ...34 Page 0M 5M FLUE INTERNAL FAN AND WALL TERMINATION INSTALL ATION ...
Страница 42: ...42 Page INTERNAL FAN ROOF TERMINATION ...
Страница 46: ...46 Page ROOFTOP TERMINATION WITH EXTERNAL MOTOR ...
Страница 49: ...49 Page 5 10M INSUL ATED FLUE CONFIGURATION ...
Страница 77: ...77 Page 10 13 5M POLYPROPYLENE FLUE CONFIGURATION ...
Страница 81: ...81 Page ...
Страница 89: ...89 Page Connect power cable connector Fit cable clamp to cable Fit front cover ...
Страница 98: ...98 Page 10 13 5M ROOFTOP POLYPROPYLENE FLUE CONFIGURATION ...
Страница 102: ...102 Page ...
Страница 103: ...103 Page SET UP WITH IN LINE OR APPLIANCE MOUNTED FAN ...
Страница 123: ...123 Page APP EN DIX 1 FL UE TERMINATION ...