Apply sealant to flue inner
and connector.
A
ALUMINIUM TO POLY PRO JOINER
DETAIL A
SCALE 1 : 25
POLY PRO FLUE PIPE 80MM DIA
MAX RUN 8.5M WITH 5 BENDS
NOTE - DRAINAGE FALL TOWARDS
FAN MODULE AT FLUE END
FLUE PIPE
75mm ALUMINIUM FLEXIBLE FLUE
RUN 5m WITH UPTO 4 BENDS
(SUPPLIED IN 5m LENGTH -
NOTE FULL 5m LENGTH MUST BE USED)
real flame pty. ltd.
1340 Ferntree Gully Rd, Scoresby Victoria 3179
Phone (03) 8706 2000 Fax (03) 87062001
www.realflame.com.au ABN 78 006 311 155
Angle +/-0.5deg
Machine finsh 3.2
No Dec. Places 0-/-0.5
No Dec. Places 1000mm over +/-1.0
3 Dec. /-0.025
2 Dec. /-0.100
1 Dec. /-0.500
UNLESS OTHERWISE SPECIFIED - ALL DIMENSIONS IN MILLIMETERS
This drawing and the information contained herein is the sole property of real flame pty ltd.
It is to be treated as confidential, it is to be returned upon request and is not to be copied or comunicated to any other
person without the written consent of real flame pty ltd.
Designed
By
Drawn
By
Drawing Practice AS1100
Material
Date
Assembly
Checked
By
Drawing No
Revision
Description
DO NOT
SCALE
Deburr and break All Sharp Corners
1 / 1
16/5/17
D.F.
1.0MM M/STEEL
Finish
Treatment
TBA
01
Fit flue clamp over flue
(loosely).
Slide flue onto connection
spigot fully.
Tighten clamp fully.
Wipe excess silicon,
visually check connection
to ensure connection is
fully sealed.
Apply sealant to flue inner
and connector.
Apply soapy water to o-ring in Poly Pro flue and dampen
surface of connector.
Push connector fully into Poly pro end connection.
Push both clips over to lock into place.
Where remove the catch tab from side of condensate
fitting. (Twist off)
Connect condensate drain trap to adapter. Insert fully.
Tighten locking hose clamp.
A
ALUMINIUM TO POLY PRO JOINER
DETAIL A
SCALE 1 : 25
POLY PRO FLUE PIPE 80MM DIA
MAX RUN 8.5M WITH 5 BENDS
NOTE - DRAINAGE FALL TOWARDS
FAN MODULE AT FLUE END
FLUE PIPE
75mm ALUMINIUM FLEXIBLE FLUE
RUN 5m WITH UPTO 4 BENDS
(SUPPLIED IN 5m LENGTH -
NOTE FULL 5m LENGTH MUST BE USED)
real flame pty. ltd.
1340 Ferntree Gully Rd, Scoresby Victoria 3179
Phone (03) 8706 2000 Fax (03) 87062001
www.realflame.com.au ABN 78 006 311 155
Angle +/-0.5deg
Machine finsh 3.2
No Dec. Places 0-/-0.5
No Dec. Places 1000mm over +/-1.0
3 Dec. /-0.025
2 Dec. /-0.100
1 Dec. /-0.500
UNLESS OTHERWISE SPECIFIED - ALL DIMENSIONS IN MILLIMETERS
This drawing and the information contained herein is the sole property of real flame pty ltd.
It is to be treated as confidential, it is to be returned upon request and is not to be copied or comunicated to any other
person without the written consent of real flame pty ltd.
Designed
By
Drawn
By
Drawing Practice AS1100
Material
Date
Assembly
Checked
By
Drawing No
Revision
Description
DO NOT
SCALE
Deburr and break All Sharp Corners
1 / 1
16/5/17
D.F.
1.0MM M/STEEL
Finish
Treatment
TBA
01
A
ALUMINIUM TO POLY PRO JOINER
DETAIL A
SCALE 1 : 25
POLY PRO FLUE PIPE 80MM DIA
MAX RUN 8.5M WITH 5 BENDS
NOTE - DRAINAGE FALL TOWARDS
FAN MODULE AT FLUE END
FLUE PIPE
75mm ALUMINIUM FLEXIBLE FLUE
RUN 5m WITH UPTO 4 BENDS
(SUPPLIED IN 5m LENGTH -
NOTE FULL 5m LENGTH MUST BE USED)
real flame pty. ltd.
1340 Ferntree Gully Rd, Scoresby Victoria 3179
Phone (03) 8706 2000 Fax (03) 87062001
www.realflame.com.au ABN 78 006 311 155
Angle +/-0.5deg
Machine finsh 3.2
No Dec. Places 0-/-0.5
No Dec. Places 1000mm over +/-1.0
3 Dec. /-0.025
2 Dec. /-0.100
1 Dec. /-0.500
UNLESS OTHERWISE SPECIFIED - ALL DIMENSIONS IN MILLIMETERS
This drawing and the information contained herein is the sole property of real flame pty ltd.
It is to be treated as confidential, it is to be returned upon request and is not to be copied or comunicated to any other
person without the written consent of real flame pty ltd.
Designed
By
Drawn
By
Drawing Practice AS1100
Material
Date
Assembly
Checked
By
Drawing No
Revision
Description
DO NOT
SCALE
Deburr and break All Sharp Corners
1 / 1
16/5/17
D.F.
1.0MM M/STEEL
Finish
Treatment
TBA
01
Содержание Element 1200 MARK 2
Страница 6: ...6 Page OPERATION INSTRUCTIONS ...
Страница 20: ...20 Page IN STALL ATION INSTRUCTIONS ...
Страница 26: ...26 Page 0 5M FLUE CONFIGURATION ...
Страница 30: ...30 Page Flue runs 0m to 5m length rooftop termination with external motor ...
Страница 34: ...34 Page 0M 5M FLUE INTERNAL FAN AND WALL TERMINATION INSTALL ATION ...
Страница 42: ...42 Page INTERNAL FAN ROOF TERMINATION ...
Страница 46: ...46 Page ROOFTOP TERMINATION WITH EXTERNAL MOTOR ...
Страница 49: ...49 Page 5 10M INSUL ATED FLUE CONFIGURATION ...
Страница 77: ...77 Page 10 13 5M POLYPROPYLENE FLUE CONFIGURATION ...
Страница 81: ...81 Page ...
Страница 89: ...89 Page Connect power cable connector Fit cable clamp to cable Fit front cover ...
Страница 98: ...98 Page 10 13 5M ROOFTOP POLYPROPYLENE FLUE CONFIGURATION ...
Страница 102: ...102 Page ...
Страница 103: ...103 Page SET UP WITH IN LINE OR APPLIANCE MOUNTED FAN ...
Страница 123: ...123 Page APP EN DIX 1 FL UE TERMINATION ...