![Real Flame Element 1200 MARK 2 Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/real-flame/element-1200-mark-2/element-1200-mark-2_installation-and-operation-manual_1425081053.webp)
53
Page
Flue runs 5m to 10m length roof top termination with external motor
AIR INTAKE 75MM ALUMINUM FLUE
MAXIUMUM RUN 10M WITH 6 BENDS
SUPPLIED AS 10M LENGTH
MAY BE CUT TO LENGTH
EXHUST FLUE 75MM ALUMINUM FLUE
MAXIUMUM RUN 10M WITH 6 BENDS
SUPPLIED AS 10M LENGTH
MAY BE CUT TO LENGTH
EXHAUST FLUE MUST BE INSULATED USING
25mm GLASSWOOL PIPE INSULATION AS
SUPPLIED BY GLEN DIMPLEX AUSTRALIA.
INSULATION MUST BE FITTED TO EXHAUST
ONLY (HOT SIDE).
INSULATION MUST START AS CLOSE TO
APPLIANCE AS POSSIBLE AND MUST BE
FULLY SEALED WITHIN 0.3M OF EACH END.
BENDS MUST BE INSULATED AND JOINS
TAPED TO PREVENT GAPS.
Содержание Element 1200 MARK 2
Страница 6: ...6 Page OPERATION INSTRUCTIONS ...
Страница 20: ...20 Page IN STALL ATION INSTRUCTIONS ...
Страница 26: ...26 Page 0 5M FLUE CONFIGURATION ...
Страница 30: ...30 Page Flue runs 0m to 5m length rooftop termination with external motor ...
Страница 34: ...34 Page 0M 5M FLUE INTERNAL FAN AND WALL TERMINATION INSTALL ATION ...
Страница 42: ...42 Page INTERNAL FAN ROOF TERMINATION ...
Страница 46: ...46 Page ROOFTOP TERMINATION WITH EXTERNAL MOTOR ...
Страница 49: ...49 Page 5 10M INSUL ATED FLUE CONFIGURATION ...
Страница 77: ...77 Page 10 13 5M POLYPROPYLENE FLUE CONFIGURATION ...
Страница 81: ...81 Page ...
Страница 89: ...89 Page Connect power cable connector Fit cable clamp to cable Fit front cover ...
Страница 98: ...98 Page 10 13 5M ROOFTOP POLYPROPYLENE FLUE CONFIGURATION ...
Страница 102: ...102 Page ...
Страница 103: ...103 Page SET UP WITH IN LINE OR APPLIANCE MOUNTED FAN ...
Страница 123: ...123 Page APP EN DIX 1 FL UE TERMINATION ...