9
PART TWO
INSTALLATION AND SERVICE INSTRUCTIONS
SECTION 1 - RECEIVING EQUIPMENT
The manufacturer recommends that this manual be reviewed thoroughly before installing your pool/spa heater.
If there are any questions that this manual does not answer, please contact the factory or your local represen-
tative.
On receipt of your equipment it is suggested that you visually check for external damage to the carton. If the
carton is damaged, a note should be made on the Bill of Lading when signing for the equipment. Remove the
heater from the carton. If it is damaged, report the damage to the carrier immediately. Save the carton.
These items are shipped inside a box in the carton with the heater:
STANDARD UNIT
1. (1) Plastic Pipe Finish Flange for Gas Line 9. (2) 3-1/2” Vinyl Grommets
2. (1) Bonding Lug with Mounting Screw 10. (1) 2” CPVC Slip Tee
3. (3) 2” CPVC Slip x Slip Nipples 11. (1) 2” x 1” CPVC Slip x FPT Bushing
4. (2) 2” CPVC Slip x MPT Adapters 12. (1) Flow Switch with Paddle
5. (2) 2” CPVC Buttress Tail Pieces 13. (1) Flow Switch Cover
6. (2) O-Rings 14. (1) IOI Manual
7. (2) 2” CPVC Slip Tail Pieces 15. (2) Warranty Documentation
8. (2) 2” CPVC Ring Nuts 16. (1) ASME Data Certification
Be sure that you receive the number of packages indicated on the Bill of Lading.
When ordering parts, you must specify the model and serial numbers of the heater. See below for location of
serial number. When ordering under warranty conditions, you must also specify date of installation.
Fig. 3: Loose Parts
Fig. 4: Unit Identification
Содержание 259B
Страница 13: ...13 Florida Building Code Fig 6 Florida Building Code 2010 Tie Down Method...
Страница 32: ...32 WIRING DIAGRAM...
Страница 44: ...44 SECTION 6 REPLACEMENT PARTS...
Страница 48: ...www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A 48...