![Ravenheat CSI 85 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/ravenheat/csi-85/csi-85_installation-and-servicing-instructions_3843807019.webp)
5.5.4
5.5.5
5.5.6
Fig. 33
Insert the flue assembly into the wall, being
careful to make sure that the outer air duct
comes flush to the inner surface of the wall.
Lift the boiler on to the wall (Fig. 34),
locating onto the top coach bolts. Fit the
two lower coach bolts and tighten all four
securing bolts.
Working above the boiler pull the flue
exhaust duct towards the boiler in order to
engage tube 61 into its header 57A.
Position flue into elbow header and push so
as to locate inner and outer flue correctly
ensuring good seal is made with o rings.
5.5.6
Fit terminal cover plate and terminal guard
(Fig. 36-37).
5.5.9
Extension kits are available on order for
flue extension of up to 2.5 metres total
length (Fig. 31).
Fig. 35
Fig. 34
Make good inside and outside wall around the air duct
20
Содержание CSI 85
Страница 26: ...27...
Страница 42: ......
Страница 45: ...SECTION 9 ELECTRICAL SYSTEM DIAGRAM Fig 94 46...
Страница 46: ...47...
Страница 47: ......
Страница 48: ...49...
Страница 52: ......
Страница 55: ...Chartists Way Morley Leeds LS27 9ET Telephone 0113 252 7007 Tfax 0113 238 0229...