CHAPTER
3
P/N 016-0171-584-H
13
CHAPTER 3
SYSTEM CALIBRATION
INITIAL START UP AND CALIBRATION WIZARD
The calibration wizard must be completed the first time that the Hawkeye
®
system is powered up on the ISOBUS
network or if the default system settings are reset. The calibration wizard allows the operator to quickly configure
the required Hawkeye
®
system and nozzle control valves detected by the Hawkeye
®
Product Controller II ECU.
Review the following sections for assistance with completing the calibration wizard for the Hawkeye
®
nozzle
control system.
NOTE:
Refer to the UT Operation Manual for other necessary setup or calibration required before operating
the
Hawkeye
®
nozzle control system or features.
TRANSFERRING UT’S
When multiple UT’s are detected on the system, a Transfer UT softkey will appear. Use this button to transfer the
PCII working set to an alternate UT at any point before, during, or after calibration.
If the PCII working set is not present on the desired display, check the other display and press the Transfer UT
softkey to transfer the PCII working set.
If more than one UT is detected and the Transfer UT softkey is not pressed, the PCII working set will automatically
load to the first UT to come online after the power cycle.
If the Transfer UT softkey is pressed, the PCII working set will automatically load to the last UT selected prior to a
power cycle unless the system needs to be recalibrated or the UT was not detected by the PC II for over two
minutes.
CALIBRATION WIZARD
To access the Hawkeye
®
calibration wizard during the initial system start up:
Transfer UT
Содержание ISO Product Controller II
Страница 1: ...ISO Product Controller II and Hawkeye Operation Manual P N 016 0171 584 H 01 19 E32470 Copyright 2019...
Страница 10: ...CHAPTER 1 viii ISO Product Controller II and Hawkeye Operation Manual...
Страница 16: ...CHAPTER 1 6 ISO Product Controller II and Hawkeye Operation Manual...
Страница 22: ...CHAPTER 2 12 ISO Product Controller II and Hawkeye Operation Manual...
Страница 50: ...CHAPTER 4 40 ISO Product Controller II and Hawkeye Operation Manual...
Страница 92: ...APPENDIX A 82 ISO Product Controller II and Hawkeye Operation Manual...
Страница 95: ...P N 016 0171 584 H 85 FIGURE 3 Generic Cabling for Self Propelled Sprayer...
Страница 97: ...P N 016 0171 584 H 87 FIGURE 5 Generic Cabling for Pull Type Sprayer with Existing Raven CAN...
Страница 99: ...P N 016 0171 584 H 89 FIGURE 7 20 Spacing Generic Cabling...
Страница 111: ...P N 016 0171 584 H 101...
Страница 112: ...APPENDIX D 102 ISO Product Controller II and Hawkeye Operation Manual...
Страница 116: ...APPENDIX E 106 ISO Product Controller II and Hawkeye Operation Manual...
Страница 120: ...APPENDIX F 110 ISO Product Controller II and Hawkeye Operation Manual...
Страница 122: ...APPENDIX G 112 ISO Product Controller II and Hawkeye Operation Manual FIGURE 1 Hawkeye Screen Flow Tools Menu Softkey...
Страница 125: ...P N 016 0171 584 H 115 FIGURE 4 Hawkeye Screen Flow Tally Registers and Diagnostics Menu Softkeys...
Страница 127: ...P N 016 0171 584 H 117 FIGURE 6 Hawkeye Injection Screen Flow Product Setup Alarms and System Information...
Страница 128: ...APPENDIX G 118 ISO Product Controller II and Hawkeye Operation Manual...
Страница 134: ...APPENDIX H 124 ISO Product Controller II and Hawkeye Operation Manual...