Machine settings
8
74
8.5.2
Running one passage
Layout:
Length of testing area: 60 to 70 m
Figure 8.13:
Layout for one passage
Preparing one passage:
Choose a similar fertiliser from the fertiliser chart and adjust the spreader ac-
cordingly.
Set the mounting height of the machine as specified in the fertiliser chart.
Make sure that the mounting height includes the top edge of the trays.
Check the spreading elements (spreading discs, spreader vanes, outlet) for
correct functioning and completeness.
Place two collecting vessels one after another at a distance of
1 m
in the over-
lap zones (between the tramlines) and one collecting vessel in the track (ac-
cording to
).
NOTICE
We recommend the layout plan up to a spreading width of
24 m
. A layout plan
for greater working widths is attached to the PPS5 practise test kit.
1/2x
1/2x
x
Содержание MDS 8.2
Страница 8: ...Intended use 1 2...
Страница 28: ...Safety 3 22...
Страница 38: ...Technical data 4 32...
Страница 42: ...Axle load calculation 5 36...
Страница 44: ...Transportation without tractor 6 38...
Страница 86: ...Machine settings 8 80...
Страница 96: ...Calibration and discharging residual material 9 90...
Страница 110: ...Important information on spreading 10 104...
Страница 114: ...Faults and possible causes 11 108...
Страница 117: ...Maintenance and service 111 12 1 Flat springs 2 locking bolts Figure 12 1 Locking bolt locked in correctly 2 1...
Страница 146: ......