Maintenance and repair
C
118
AXIS
A
X
IS
20.
2
C.2
Lubrication of weighing spreader
Figure 21:
Lubrication point of weighing spreader
C.3
Checking the screw connections of the weigh cell
The machine is equipped with 2 weigh cells and a tie rod. These elements are
fixed by means of screw connections.
Check the screw connections for the weigh cells and the tie rod for tightness on
both sides of the machine:
before every spreading season
also during the spreading season if necessary.
Checking:
1.
Tighten the screw connec-
tion with a torque wrench
(Tightening torque =
300 Nm
).
Figure 22:
Fastening the weighing cell (on
the left side of the direction of
travel)
K
D
R
C
Q
W
EMC
Содержание AXIS-M 20.2 EMC
Страница 4: ......
Страница 12: ...Table of Contents VIII ...
Страница 44: ...Safety 3 24 AXIS AXIS ...
Страница 51: ...Technical data 31 4 AXIS AXIS 4 2 4 Agitator Figure 4 6 Agitator 1 Metering slide 2 Agitator ...
Страница 64: ...Axle load calculation 5 44 AXIS AXIS ...
Страница 66: ...Transportation without tractor 6 46 AXIS AXIS ...
Страница 68: ...Instructions regarding the spreading operation 7 48 AXIS AXIS ...
Страница 110: ...General commissioning all machine types 8 90 AXIS AXIS ...
Страница 144: ...Maintenance and repair C 124 AXIS AXIS 20 2 ...
Страница 178: ...Maintenance and repair C 158 AXIS AXIS 30 1 AXIS 40 1 ...
Страница 214: ...Maintenance and repair C 194 AXIS AXIS 50 2 ...
Страница 236: ......