Spreading operation
139
B
AXIS
AXIS
20.1
AXIS
30.2, AXIS 40.2
B.6.2
Implementing the calibration
Requirements:
The metering slides are closed.
PTO and tractor engine are switched off and locked to prevent unauthorised
starting.
An adequately sized container is ready for collecting the fertiliser (minimum
capacity
25 kg
).
-
Determine the empty weight of the collecting vessel.
Prepare the calibration test chute. The calibration test chute is located in the
centre behind the spreading disc guard.
A sufficient quantity of fertiliser is placed in the hopper.
Using the fertiliser chart, the pre-set values for the metering slide end stop,
the PTO speed and the calibration test time are determined and known.
n
WARNING
Risk of injury due to chemicals
Escaping fertiliser may lead to injury to eyes and nasal mucous
membrane.
Wear safety goggles during the calibration.
Before running the calibration test, ensure that all people
leave the hazard zone of the machine.
NOTICE
Select the values for the calibration test for the maximum possible spreading
rate. The greater the quantity, the greater the precision of the measurement.
[1] Position of the calibration test
chute
Figure 9:
Calibration test chute
1
K
D
R
C
Q
W
EMC
Содержание AXIS-M 20.2 EMC
Страница 4: ......
Страница 12: ...Table of Contents VIII ...
Страница 44: ...Safety 3 24 AXIS AXIS ...
Страница 51: ...Technical data 31 4 AXIS AXIS 4 2 4 Agitator Figure 4 6 Agitator 1 Metering slide 2 Agitator ...
Страница 64: ...Axle load calculation 5 44 AXIS AXIS ...
Страница 66: ...Transportation without tractor 6 46 AXIS AXIS ...
Страница 68: ...Instructions regarding the spreading operation 7 48 AXIS AXIS ...
Страница 110: ...General commissioning all machine types 8 90 AXIS AXIS ...
Страница 144: ...Maintenance and repair C 124 AXIS AXIS 20 2 ...
Страница 178: ...Maintenance and repair C 158 AXIS AXIS 30 1 AXIS 40 1 ...
Страница 214: ...Maintenance and repair C 194 AXIS AXIS 50 2 ...
Страница 236: ......