160
D
OMINION
SX
U
SER
G
UIDE
Associations Power Control
Click
Associations Power Control
on the
Power Control
menu to access the tool to manage
power control associations.
Figure 97 Associations Power Control
Note: When executing power on/off operation, about ~5 seconds are added to the
configured sequential interval, resulting in an operational delay time (minimum amount of
time to operate). If power cycle is selected, all associated outlets will be powered off
sequentially, and then powered on sequentially. The cycle delay time reacted here
determines the minimum length of time needed to turn back on the outlets after they’re
shut down, which is user-specified by administrator. The delay time to experience would be
operational delay + user-specified delay.
Содержание DOMINION SX -
Страница 1: ...Dominion SX User Guide Release 3 1 Copyright 2007 Raritan Inc DSX 0M E April 2007 255 60 2000 00...
Страница 2: ...This page intentionally left blank...
Страница 18: ...This page intentionally left blank...
Страница 22: ...4 DOMINION SX USER GUIDE This page intentionally left blank...
Страница 44: ...26 DOMINION SX USER GUIDE...
Страница 48: ...30 DOMINION SX USER GUIDE...
Страница 83: ...CHAPTER 8 SECURITY 65 Figure 59 SSL Client Certificate Screen...
Страница 104: ...86 DOMINION SX USER GUIDE...
Страница 170: ...152 DOMINION SX USER GUIDE...
Страница 174: ...156 DOMINION SX USER GUIDE...
Страница 196: ...178 DOMINION SX USER GUIDE Install the Dominion SX Server Certificate section that follows...
Страница 203: ...APPENDIX C CERTIFICATES 185...
Страница 204: ...186 DOMINION SX USER GUIDE...
Страница 212: ...194 DOMINION SX USER GUIDE...
Страница 225: ...APPENDIX F TROUBLESHOOTING 207 255 60 2000 00...